THE ORIO AND LA BAELLS VIADUCTS
José Antonio Martínez Martínez
Abstract
José Antonio Martínez Martínez
Abstract
DETAILS ARE GIVEN OF THE DESIGN AND CONSTRUCTION OF THE TWO VIADUCTS. THE FIRST IS 23 M WIDE AND 480 M LONG. THE DECK, WHICH CONSISTS OF 5 PRECAST GIRDERS, RESTS ON BRACKETS FIXED IN MEMBERS ABOVE THE WATER LEVEL. THE SECOND BRIDGE, 484 M LONG AND OF A MAXIMUM HEIGHT OF 100 M, WAS BUILT ACCORDING TO A CONVENTIONAL STRUCTURAL SYSTEM AND COMPRISES PRECAST PRESTRESSED CONCRETE GIRDERS AND A REINFORCED CONCRETE SLAB.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
DETAILS ARE GIVEN OF THE DESIGN AND CONSTRUCTION OF THE TWO VIADUCTS. THE FIRST IS 23 M WIDE AND 480 M LONG. THE DECK, WHICH CONSISTS OF 5 PRECAST GIRDERS, RESTS ON BRACKETS FIXED IN MEMBERS ABOVE THE WATER LEVEL. THE SECOND BRIDGE, 484 M LONG AND OF A MAXIMUM HEIGHT OF 100 M, WAS BUILT ACCORDING TO A CONVENTIONAL STRUCTURAL SYSTEM AND COMPRISES PRECAST PRESTRESSED CONCRETE GIRDERS AND A REINFORCED CONCRETE SLAB.
Key concepts: Precast concrete, Girder, Deck, Slab, Structural engineering, Prestressed concrete, Bridge (graph theory), Engineering