REPORT ON BRIDGES BUILT BETWEEN 1971 AND 1975

Carlos Rodríguez Fernández

Open publisher page 0 citations

Abstract

A LIST IS GIVEN OF BRIDGES CONSTRUCTED IN SPAIN DURING THE LAST 5 YEARS; IT ENCOMPASSES ALL TYPES OF PRESTRESSED CONCRETE STRUCTURE AND ALL CURRENTLY USED CONSTRUCTION METHODS, E.G., CONTINUOUS GIRDERS WITH MARKED PLANE CURVATURE FOR TYPICAL 30 M URBAN BRIDGE SPANS BUILT ON SCAFFOLDINGS, CONTINUOUS 130 M SPAN SECTIONS FOR VERY HIGH BRIDGES PRECAST IN SUCCESSIVE CANTILEVERS. DETAILS ARE GIVEN OF THE LAUNCHING OF GIRDERS, AND THE PREFLEX SYSTEM WITH WHICH PRECAST GIRDERS OF 1/20 SLENDERNESS CAN BE BUILT IN A PLANT. MENTION IS MADE OF A DRAFT STANDARDIZATION OF BRIDGE PIERS, BOX GIRDERS AND BRIDGE DECK SLABS.

About this research paper

What this paper is about

A LIST IS GIVEN OF BRIDGES CONSTRUCTED IN SPAIN DURING THE LAST 5 YEARS; IT ENCOMPASSES ALL TYPES OF PRESTRESSED CONCRETE STRUCTURE AND ALL CURRENTLY USED CONSTRUCTION METHODS, E.G., CONTINUOUS GIRDERS WITH MARKED PLANE CURVATURE FOR TYPICAL 30 M URBAN BRIDGE SPANS BUILT ON SCAFFOLDINGS, CONTINUOUS 130 M SPAN SECTIONS FOR VERY HIGH BRIDGES PRECAST IN SUCCESSIVE CANTILEVERS. DETAILS ARE GIVEN OF THE LAUNCHING OF GIRDERS, AND THE PREFLEX SYSTEM WITH WHICH PRECAST GIRDERS OF 1/20 SLENDERNESS CAN BE BUILT IN A PLANT. MENTION IS MADE OF A DRAFT STANDARDIZATION OF BRIDGE PIERS, BOX GIRDERS AND BRIDGE DECK SLABS.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A LIST IS GIVEN OF BRIDGES CONSTRUCTED IN SPAIN DURING THE LAST 5 YEARS; IT ENCOMPASSES ALL TYPES OF PRESTRESSED CONCRETE STRUCTURE AND ALL CURRENTLY USED CONSTRUCTION METHODS, E.G., CONTINUOUS GIRDERS WITH MARKED PLANE CURVATURE FOR TYPICAL 30 M URBAN BRIDGE SPANS BUILT ON SCAFFOLDINGS, CONTINUOUS 130 M SPAN SECTIONS FOR VERY HIGH BRIDGES PRECAST IN SUCCESSIVE CANTILEVERS. DETAILS ARE GIVEN OF THE LAUNCHING OF GIRDERS, AND THE PREFLEX SYSTEM WITH WHICH PRECAST GIRDERS OF 1/20 SLENDERNESS CAN BE BUILT IN A PLANT. MENTION IS MADE OF A DRAFT STANDARDIZATION OF BRIDGE PIERS, BOX GIRDERS AND BRIDGE DECK SLABS.

Key concepts: Precast concrete, Girder, Bridge (graph theory), Structural engineering, Deck, Box girder, Engineering, Span (engineering)

Related papers

Back to paper searchBrowse research topicsOriginal source
REPORT ON BRIDGES BUILT BETWEEN 1971 AND 1975 — Research Paper | ScholarLens