ARE THE OPERATING COSTS OF THE TRAMWAY TOO HIGH

A Erkens, Pbl Wiggenraad

Open publisher page 0 citations

Abstract

The operating costs of urban public transport, consisting of costs per kilometer, costs of personnel and costs of capacity, must be covered in the future for 50% by the income of the transport company. This report gives an insight into the highness of these costs and by which methods these costs can be influenced. The tram has the highest costs, the speed and the distance between the stops are comparable with the bus. As long as this situation is maintained, it is better to change the policy from tram into bus. For the covering abstract of the conference see IRRD 884059.

About this research paper

What this paper is about

The operating costs of urban public transport, consisting of costs per kilometer, costs of personnel and costs of capacity, must be covered in the future for 50% by the income of the transport company. This report gives an insight into the highness of these costs and by which methods these costs can be influenced. The tram has the highest costs, the speed and the distance between the stops are comparable with the bus. As long as this situation is maintained, it is better to change the policy from tram into bus. For the covering abstract of the conference see IRRD 884059.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The operating costs of urban public transport, consisting of costs per kilometer, costs of personnel and costs of capacity, must be covered in the future for 50% by the income of the transport company. This report gives an insight into the highness of these costs and by which methods these costs can be influenced. The tram has the highest costs, the speed and the distance between the stops are comparable with the bus. As long as this situation is maintained, it is better to change the policy from tram into bus. For the covering abstract of the conference see IRRD 884059.

Key concepts: Public transport, Kilometer, Transport engineering, Operating cost, Cost–benefit analysis, Business, Total cost, Engineering