The article discusses a resurfacing project on a four-lane street through a busy commercial section of Wichita. A heavy-duty pavement tape was used for marking center lines and lanes; the key equipment in the operation was a Cutler repaver. Operations began with the 30-ton repaver moving down a closed section of roadway, where it broke up old asphalt, mixed it with new, and laid a 12-foot wide strip of fresh asphalt. This operation occurred all in one pass at a rate of one-quarter mile per day. A two-man crew followed behind, inlaying pavement tape with a special applicator. One worker pushed the applicator while the second followed with a finish roller that tamped the tape into the warm asphalt. Completed sections were reopened for traffic the same day.

About this research paper

What this paper is about

The article discusses a resurfacing project on a four-lane street through a busy commercial section of Wichita. A heavy-duty pavement tape was used for marking center lines and lanes; the key equipment in the operation was a Cutler repaver. Operations began with the 30-ton repaver moving down a closed section of roadway, where it broke up old asphalt, mixed it with new, and laid a 12-foot wide strip of fresh asphalt. This operation occurred all in one pass at a rate of one-quarter mile per day. A two-man crew followed behind, inlaying pavement tape with a special applicator. One worker pushed the applicator while the second followed with a finish roller that tamped the tape into the warm asphalt. Completed sections were reopened for traffic the same day.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The article discusses a resurfacing project on a four-lane street through a busy commercial section of Wichita. A heavy-duty pavement tape was used for marking center lines and lanes; the key equipment in the operation was a Cutler repaver. Operations began with the 30-ton repaver moving down a closed section of roadway, where it broke up old asphalt, mixed it with new, and laid a 12-foot wide strip of fresh asphalt. This operation occurred all in one pass at a rate of one-quarter mile per day. A two-man crew followed behind, inlaying pavement tape with a special applicator. One worker pushed the applicator while the second followed with a finish roller that tamped the tape into the warm asphalt. Completed sections were reopened for traffic the same day.

Key concepts: Data striping, Engineering, Asphalt, Heavy duty, Barrel (horology), Mile, Asphalt pavement, Computer science