Keeping it quiet below Berlin

Mirko Dold

Open publisher page 0 citations

Abstract

DB ProjeckBau GmbH is building a four-track railway under the heart of Berlin, Germany, to create a 9km link between the northern and southern sides of the city's inner rail ring. About 3.5 km of the route runs underground under the commercial centre and government district. Consultants Dr Heiland were commissioned to model the transmission of vibrations from the tunnel floor into adjacent buildings. Mass-spring measures were used to reduce vibration and noise. Instead of being fixed to the tunnel floor, the track sits in a rigid concrete trough supported by polymer bearings with a range of geometries. Assembly of the heavy mass-spring systems involved installing a lining on the tunnel floor, pouring the concrete slab in situ, lifting the slab in 200 m sections with hydraulic jacks, positioning the bearings using a sliding gauge and lowering the trough. For the light mass-spring systems, the concrete is poured directly onto pre-installed full-surface elastic mats. Tests have shown that forecast levels of vibration and noise in surrounding buildings have been achieved.

About this research paper

What this paper is about

DB ProjeckBau GmbH is building a four-track railway under the heart of Berlin, Germany, to create a 9km link between the northern and southern sides of the city's inner rail ring. About 3.5 km of the route runs underground under the commercial centre and government district. Consultants Dr Heiland were commissioned to model the transmission of vibrations from the tunnel floor into adjacent buildings. Mass-spring measures were used to reduce vibration and noise. Instead of being fixed to the tunnel floor, the track sits in a rigid concrete trough supported by polymer bearings with a range of geometries. Assembly of the heavy mass-spring systems involved installing a lining on the tunnel floor, pouring the concrete slab in situ, lifting the slab in 200 m sections with hydraulic jacks, positioning the bearings using a sliding gauge and lowering the trough. For the light mass-spring systems, the concrete is poured directly onto pre-installed full-surface elastic mats. Tests have shown that forecast levels of vibration and noise in surrounding buildings have been achieved.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

DB ProjeckBau GmbH is building a four-track railway under the heart of Berlin, Germany, to create a 9km link between the northern and southern sides of the city's inner rail ring. About 3.5 km of the route runs underground under the commercial centre and government district. Consultants Dr Heiland were commissioned to model the transmission of vibrations from the tunnel floor into adjacent buildings. Mass-spring measures were used to reduce vibration and noise. Instead of being fixed to the tunnel floor, the track sits in a rigid concrete trough supported by polymer bearings with a range of geometries. Assembly of the heavy mass-spring systems involved installing a lining on the tunnel floor, pouring the concrete slab in situ, lifting the slab in 200 m sections with hydraulic jacks, positioning the bearings using a sliding gauge and lowering the trough. For the light mass-spring systems, the concrete is poured directly onto pre-installed full-surface elastic mats. Tests have shown that forecast levels of vibration and noise in surrounding buildings have been achieved.

Key concepts: Slab, Trough (economics), Vibration, Track (disk drive), Spring (device), Engineering, Structural engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Keeping it quiet below Berlin — Research Paper | ScholarLens