ANALYSIS OF DEFECTS IN 180KM OF PIPE SEWERS IN SOUTHERN WATER AUTHORITY

M P O'reilly, R B Rosbrook, G. Cox, A McCloskey

Open publisher page 16 citations

Abstract

This report describes an analysis of the defects found during closed circuit television survey inspection of the sewers of the Southern Water Authority. Structurally damaged pipes were found in marginally less than 5.6 per cent of the total length surveyed with large displaced and open joints being found in some 0.8 per cent. The relation between these defects and the age of construction, the lengths, depths, diameter and material of the pipes, the location of the sewer, soil type and whether the sewer carried foul sewage, surface water or a combination of both are examined. Almost a quarter of connections were found to be faulty and it is concluded that their substitution by junctions would remove a major source of structural defects from pipe sewers. Other findings are that sewers constructed since 1945 have a much lower rate of structural defects than older sewers, that current methods of structural design are adequate and recommends CCTV surveying of newly constructed sewers and sewers proposed for adoption. (Author/TRRL)

About this research paper

What this paper is about

This report describes an analysis of the defects found during closed circuit television survey inspection of the sewers of the Southern Water Authority. Structurally damaged pipes were found in marginally less than 5.6 per cent of the total length surveyed with large displaced and open joints being found in some 0.8 per cent. The relation between these defects and the age of construction, the lengths, depths, diameter and material of the pipes, the location of the sewer, soil type and whether the sewer carried foul sewage, surface water or a combination of both are examined. Almost a quarter of connections were found to be faulty and it is concluded that their substitution by junctions would remove a major source of structural defects from pipe sewers. Other findings are that sewers constructed since 1945 have a much lower rate of structural defects than older sewers, that current methods of structural design are adequate and recommends CCTV surveying of newly constructed sewers and sewers proposed for adoption. (Author/TRRL)

Why it matters

OpenAlex reports 16 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This report describes an analysis of the defects found during closed circuit television survey inspection of the sewers of the Southern Water Authority. Structurally damaged pipes were found in marginally less than 5.6 per cent of the total length surveyed with large displaced and open joints being found in some 0.8 per cent. The relation between these defects and the age of construction, the lengths, depths, diameter and material of the pipes, the location of the sewer, soil type and whether the sewer carried foul sewage, surface water or a combination of both are examined. Almost a quarter of connections were found to be faulty and it is concluded that their substitution by junctions would remove a major source of structural defects from pipe sewers. Other findings are that sewers constructed since 1945 have a much lower rate of structural defects than older sewers, that current methods of structural design are adequate and recommends CCTV surveying of newly constructed sewers and sewers proposed for adoption. (Author/TRRL)

Key concepts: Sanitary sewer, Sewage, Civil engineering, Quarter (Canadian coin), Engineering, Sanitary engineering, Forensic engineering, Environmental engineering