Hassle-Free Bridge Rehab

Charles A Baumgartner, Kenneth D Ishmael

Open publisher page 0 citations

Abstract

Engineers involved in Cleveland's Main Bridge rehab invoked whatever was necessary to keep area traffic moving and the bridge closure period to a minimum. They helped change state laws forbidding incentive/disincentive construction, transferred shop drawings approval from state to local control, assembled a value engineering team, and took a proactive approach to traffic management. After more than 50 years of service, the Main Avenue Bridge needed major repairs. Taking the major link between downtown and the city's west side out of service could produce a traffic nightmare. Minimizing public inconvenience would be a high priority of any rehabilitation project. The bridge, built in 1940, is near the Lake Erie shoreline. The 6,500 ft-long structure carries 49,000 vehicles a day across the Cuyahoga River Valley in six lanes. Since 1984, bridge repair costs have averaged about $80,000 per year. The structure needed major rehabilitation work such as: Replacing the existing deck and stringers with a new widened deck, providing the transverse deck cross slope and/or superelevation as required (much of the present alignment is horizontally curved and transversely level), adding new sealed joints, and replacing the drainage system and all structurally deficient and functionally obsolete members.

About this research paper

What this paper is about

Engineers involved in Cleveland's Main Bridge rehab invoked whatever was necessary to keep area traffic moving and the bridge closure period to a minimum. They helped change state laws forbidding incentive/disincentive construction, transferred shop drawings approval from state to local control, assembled a value engineering team, and took a proactive approach to traffic management. After more than 50 years of service, the Main Avenue Bridge needed major repairs. Taking the major link between downtown and the city's west side out of service could produce a traffic nightmare. Minimizing public inconvenience would be a high priority of any rehabilitation project. The bridge, built in 1940, is near the Lake Erie shoreline. The 6,500 ft-long structure carries 49,000 vehicles a day across the Cuyahoga River Valley in six lanes. Since 1984, bridge repair costs have averaged about $80,000 per year. The structure needed major rehabilitation work such as: Replacing the existing deck and stringers with a new widened deck, providing the transverse deck cross slope and/or superelevation as required (much of the present alignment is horizontally curved and transversely level), adding new sealed joints, and replacing the drainage system and all structurally deficient and functionally obsolete members.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Engineers involved in Cleveland's Main Bridge rehab invoked whatever was necessary to keep area traffic moving and the bridge closure period to a minimum. They helped change state laws forbidding incentive/disincentive construction, transferred shop drawings approval from state to local control, assembled a value engineering team, and took a proactive approach to traffic management. After more than 50 years of service, the Main Avenue Bridge needed major repairs. Taking the major link between downtown and the city's west side out of service could produce a traffic nightmare. Minimizing public inconvenience would be a high priority of any rehabilitation project. The bridge, built in 1940, is near the Lake Erie shoreline. The 6,500 ft-long structure carries 49,000 vehicles a day across the Cuyahoga River Valley in six lanes. Since 1984, bridge repair costs have averaged about $80,000 per year. The structure needed major rehabilitation work such as: Replacing the existing deck and stringers with a new widened deck, providing the transverse deck cross slope and/or superelevation as required (much of the present alignment is horizontally curved and transversely level), adding new sealed joints, and replacing the drainage system and all structurally deficient and functionally obsolete members.

Key concepts: Bridge (graph theory), Deck, Engineering, Downtown, Civil engineering, Transport engineering, Closure (psychology), Work (physics)