1990New Civil EngineerRequires access

ENTER STAGE LEFT

D. Fowler

Open publisher page 2 citations

Abstract

This article describes the conversion of the Lucy Mill Bridge, a disused rail bridge, to provide a much needed and long awaited second road crossing across the river Avon at Stratford-upon-Avon, England. Although the bridge has been requested by local residents since 1920, the land for the bridge was only acquired in 1987. The new bridge will relieve the extremely long traffic queues on Clopton Bridge, the only existing road bridge during summer months; it will also allow the more rapid completion of essential maintenance on that bridge. Lucy Mill Bridge will be part of a new 1.6 km long, 7.3 m wide single carriageway road, whose construction started in July 1990. The bridge works, which cost about 500,000 of the total 1.65 million cost of the scheme, include strengthening the existing substructure and adding a new reinforced concrete deck on top. The top will cantilever out over the masonry on both sides, to provide a 1 m footway on each side of the road. Extensive investigations were carried out, to ensure that the bridge was in a suitable condition for its new use, even though it had not been maintained since the 1960s. Completion of the bridge is expected in May 1990.

About this research paper

What this paper is about

This article describes the conversion of the Lucy Mill Bridge, a disused rail bridge, to provide a much needed and long awaited second road crossing across the river Avon at Stratford-upon-Avon, England. Although the bridge has been requested by local residents since 1920, the land for the bridge was only acquired in 1987. The new bridge will relieve the extremely long traffic queues on Clopton Bridge, the only existing road bridge during summer months; it will also allow the more rapid completion of essential maintenance on that bridge. Lucy Mill Bridge will be part of a new 1.6 km long, 7.3 m wide single carriageway road, whose construction started in July 1990. The bridge works, which cost about 500,000 of the total 1.65 million cost of the scheme, include strengthening the existing substructure and adding a new reinforced concrete deck on top. The top will cantilever out over the masonry on both sides, to provide a 1 m footway on each side of the road. Extensive investigations were carried out, to ensure that the bridge was in a suitable condition for its new use, even though it had not been maintained since the 1960s. Completion of the bridge is expected in May 1990.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article describes the conversion of the Lucy Mill Bridge, a disused rail bridge, to provide a much needed and long awaited second road crossing across the river Avon at Stratford-upon-Avon, England. Although the bridge has been requested by local residents since 1920, the land for the bridge was only acquired in 1987. The new bridge will relieve the extremely long traffic queues on Clopton Bridge, the only existing road bridge during summer months; it will also allow the more rapid completion of essential maintenance on that bridge. Lucy Mill Bridge will be part of a new 1.6 km long, 7.3 m wide single carriageway road, whose construction started in July 1990. The bridge works, which cost about 500,000 of the total 1.65 million cost of the scheme, include strengthening the existing substructure and adding a new reinforced concrete deck on top. The top will cantilever out over the masonry on both sides, to provide a 1 m footway on each side of the road. Extensive investigations were carried out, to ensure that the bridge was in a suitable condition for its new use, even though it had not been maintained since the 1960s. Completion of the bridge is expected in May 1990.

Key concepts: Bridge (graph theory), Carriageway, Deck, Masonry, Engineering, Civil engineering, Span (engineering), Transport engineering