2013Railway ageRequires access

Gotham's Robust Rail Growth

Douglas John Bowen

Open publisher page 0 citations

Abstract

This article describes rail system growth taking place in New York City and surrounding areas. Among the topics discussed are the city’s growing equipment needs, which mandated the recent order of 584 M-9 electric multiple-unit (EMU) cars for the Long Island Railroad and Metropath. The article highlights a number of planned infrastructure projects, including the opening of the $1.4 billion Fulton Center and the $8.2 billion East Side Access project. The author also describes damage sustained by the rail system as a result of Superstorm Sandy in 2012 and repair work being completed on storm-damaged subway tubes and substations.

About this research paper

What this paper is about

This article describes rail system growth taking place in New York City and surrounding areas. Among the topics discussed are the city’s growing equipment needs, which mandated the recent order of 584 M-9 electric multiple-unit (EMU) cars for the Long Island Railroad and Metropath. The article highlights a number of planned infrastructure projects, including the opening of the $1.4 billion Fulton Center and the $8.2 billion East Side Access project. The author also describes damage sustained by the rail system as a result of Superstorm Sandy in 2012 and repair work being completed on storm-damaged subway tubes and substations.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article describes rail system growth taking place in New York City and surrounding areas. Among the topics discussed are the city’s growing equipment needs, which mandated the recent order of 584 M-9 electric multiple-unit (EMU) cars for the Long Island Railroad and Metropath. The article highlights a number of planned infrastructure projects, including the opening of the $1.4 billion Fulton Center and the $8.2 billion East Side Access project. The author also describes damage sustained by the rail system as a result of Superstorm Sandy in 2012 and repair work being completed on storm-damaged subway tubes and substations.

Key concepts: Rail transit, Engineering, Work (physics), Transport engineering, Unit (ring theory), Light rail transit, Transportation infrastructure, Order (exchange)

Related papers

Back to paper searchBrowse research topicsOriginal source
Gotham's Robust Rail Growth — Research Paper | ScholarLens