TWIN PASSAGES BURROW UNDER THE LAND OF LAKES AND AIRPLANES : MINNEAPOLIS-ST. PAUL LIGHT-RAIL LINE REQUIRED TOUGH DIGS

A Cho

Open publisher page 0 citations

Abstract

Renovation and construction at the Minneapolis-St. Paul International Airport includes extensive tunneling work. One job that recently broke through was the digging of twin, 7,300-ft. long tunnels for a light rail line connection the airport to Minneapolis' downtown and the Mall of America. Still to be completed is a major station and cross- passages. Work is being done in three 8-hour shifts. Officials used a design-bid-build project delivery because the airport didn't want to cede control because it involves two runways, roads and a flight center. The first tunnel boring machine was stalled by the challenging geology at the site. Glacial till lies on top of limestone and thick shales that hold in water, with sandstone below that. Stability and moisture were issues. Grouting was used to stabilize the excavation face and computerized gauges aboveground monitored soil settlement. Pre-case concrete panels were installed as liner. Mucking out was messy and wet. Fitting out the tunnels with rail and electronic components and construction of the at-grade portions of the route are proceeding next. Five other tunnels, four for vehicles and one for pedestrians, are almost complete; they are made with cut and cover reinforced concrete and capable of withstanding plane loads of up to 1.3 million lbs.

About this research paper

What this paper is about

Renovation and construction at the Minneapolis-St. Paul International Airport includes extensive tunneling work. One job that recently broke through was the digging of twin, 7,300-ft. long tunnels for a light rail line connection the airport to Minneapolis' downtown and the Mall of America. Still to be completed is a major station and cross- passages. Work is being done in three 8-hour shifts. Officials used a design-bid-build project delivery because the airport didn't want to cede control because it involves two runways, roads and a flight center. The first tunnel boring machine was stalled by the challenging geology at the site. Glacial till lies on top of limestone and thick shales that hold in water, with sandstone below that. Stability and moisture were issues. Grouting was used to stabilize the excavation face and computerized gauges aboveground monitored soil settlement. Pre-case concrete panels were installed as liner. Mucking out was messy and wet. Fitting out the tunnels with rail and electronic components and construction of the at-grade portions of the route are proceeding next. Five other tunnels, four for vehicles and one for pedestrians, are almost complete; they are made with cut and cover reinforced concrete and capable of withstanding plane loads of up to 1.3 million lbs.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Renovation and construction at the Minneapolis-St. Paul International Airport includes extensive tunneling work. One job that recently broke through was the digging of twin, 7,300-ft. long tunnels for a light rail line connection the airport to Minneapolis' downtown and the Mall of America. Still to be completed is a major station and cross- passages. Work is being done in three 8-hour shifts. Officials used a design-bid-build project delivery because the airport didn't want to cede control because it involves two runways, roads and a flight center. The first tunnel boring machine was stalled by the challenging geology at the site. Glacial till lies on top of limestone and thick shales that hold in water, with sandstone below that. Stability and moisture were issues. Grouting was used to stabilize the excavation face and computerized gauges aboveground monitored soil settlement. Pre-case concrete panels were installed as liner. Mucking out was messy and wet. Fitting out the tunnels with rail and electronic components and construction of the at-grade portions of the route are proceeding next. Five other tunnels, four for vehicles and one for pedestrians, are almost complete; they are made with cut and cover reinforced concrete and capable of withstanding plane loads of up to 1.3 million lbs.

Key concepts: Downtown, Excavation, Settlement (finance), Digging, Runway, Engineering, Work (physics), Railway line