2003Rail internationalRequires access

OERESUND RAIL LINK PROVIDES GROWTH

J Restrup-Soerensen

Open publisher page 0 citations

Abstract

The Oeresund rail link between Sweden and Denmark allows trains to run from the Arctic to the Mediterranean without a break. The 16-km rail and road link across the Oeresund between Copenhagen and Malmoe has led to development and integration on both sides. The freight operator IKEA Rail AB began operations on the Oeresund bridge in 2002. Oeresundsbro Konsortiet is responsible for operation and maintenance of the coast-to-coast rail line and all related costs. Operating experiences are discussed with reference to safety and incident levels, traffic volumes and reliability. Oeresundsbro Konsortiet's business plan is described. One of the key activities of Oeresundsbro Konsortiet is to create a viable rail transport system for existing and future rail operators crossing the Oeresund rail link.

About this research paper

What this paper is about

The Oeresund rail link between Sweden and Denmark allows trains to run from the Arctic to the Mediterranean without a break. The 16-km rail and road link across the Oeresund between Copenhagen and Malmoe has led to development and integration on both sides. The freight operator IKEA Rail AB began operations on the Oeresund bridge in 2002. Oeresundsbro Konsortiet is responsible for operation and maintenance of the coast-to-coast rail line and all related costs. Operating experiences are discussed with reference to safety and incident levels, traffic volumes and reliability. Oeresundsbro Konsortiet's business plan is described. One of the key activities of Oeresundsbro Konsortiet is to create a viable rail transport system for existing and future rail operators crossing the Oeresund rail link.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Oeresund rail link between Sweden and Denmark allows trains to run from the Arctic to the Mediterranean without a break. The 16-km rail and road link across the Oeresund between Copenhagen and Malmoe has led to development and integration on both sides. The freight operator IKEA Rail AB began operations on the Oeresund bridge in 2002. Oeresundsbro Konsortiet is responsible for operation and maintenance of the coast-to-coast rail line and all related costs. Operating experiences are discussed with reference to safety and incident levels, traffic volumes and reliability. Oeresundsbro Konsortiet's business plan is described. One of the key activities of Oeresundsbro Konsortiet is to create a viable rail transport system for existing and future rail operators crossing the Oeresund rail link.

Key concepts: Transport engineering, Train, Bridge (graph theory), Rail traffic, Engineering, Link (geometry), Reliability (semiconductor), Rail transit

Related papers

Back to paper searchBrowse research topicsOriginal source
OERESUND RAIL LINK PROVIDES GROWTH — Research Paper | ScholarLens