HIGH SPEED STRATEGY UNFOLDS
E Jaensch
Abstract
E Jaensch
Abstract
This article describes the latest developments in the high-speed train development programme of the German Federal Railway (DB). Stage 1 of the programme was completed in May 1993, with all 60 sets of DB's IC- Express (ICE) fleet in revenue service. The implementation of Stage 2 has begun, and Stage 3 will follow in 2000. During Stage 1, 100km of new line was constructed, and about 2,300km of other routes were upgraded, much of it for 200kph. As a result, three high-speed ICE routes are now running, which are very popular, because of their competitive journey times. Stage 2 objectives include: (1) improving links between the former West Germany and East Germany; (2) extending the German ICE network, and integrating it with routes planned as European high-speed corridors; (3) establishing high-capacity corridors for long-distance international freight; (4) remodelling Berlin's whole rail infrastructure. New ICE routes will include Hannover to Berlin and Koeln to Frankfurt. On curving routes where the very high costs of new lines cannot be justified, preparations are being made to introduce tilting trains, whose top speed can be upgraded from 120kph to 160kph. They may also be introduced as a short-term measure to speed services before tracks are upgraded. A table presents German railways' capital investment programme for 1992-2000.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This article describes the latest developments in the high-speed train development programme of the German Federal Railway (DB). Stage 1 of the programme was completed in May 1993, with all 60 sets of DB's IC- Express (ICE) fleet in revenue service. The implementation of Stage 2 has begun, and Stage 3 will follow in 2000. During Stage 1, 100km of new line was constructed, and about 2,300km of other routes were upgraded, much of it for 200kph. As a result, three high-speed ICE routes are now running, which are very popular, because of their competitive journey times. Stage 2 objectives include: (1) improving links between the former West Germany and East Germany; (2) extending the German ICE network, and integrating it with routes planned as European high-speed corridors; (3) establishing high-capacity corridors for long-distance international freight; (4) remodelling Berlin's whole rail infrastructure. New ICE routes will include Hannover to Berlin and Koeln to Frankfurt. On curving routes where the very high costs of new lines cannot be justified, preparations are being made to introduce tilting trains, whose top speed can be upgraded from 120kph to 160kph. They may also be introduced as a short-term measure to speed services before tracks are upgraded. A table presents German railways' capital investment programme for 1992-2000.
Key concepts: Train, Revenue, German, Transport engineering, Service (business), Investment (military), Telecommunications, Engineering