THE RESPONSE OF LONDON CLAY TO FULL-FACE TBM TUNNELLING AT WEST HAM, LONDON
Steve Macklin, Grant Field
Abstract
Steve Macklin, Grant Field
Abstract
A 2.8 metre outer diameter cable tunnel, 1.75km in length, has been driven using a closed face Tunnel Boring Machine (TBM), from West Ham to the Greenwich Peninsula in East London, to provide power to the site of the Millennium Dome. The choice of tunnelling to install electricity cables, rather than open trenching techniques, was made in order to minimise the potential disruption in London's congested urban environment. The construction of cable tunnels for the client (London Electricity plc) has facilitated the on-going modernisation programme of this important element of the city's infrastructure. In order to gain field data relating to the behaviour of London Clay around an advancing tunnel and at the same time to progress current in-house research initiatives, Brown & Root took the opportunity to establish a monitoring site in advance of the tunnel construction. Surface and sub-surface instrumentation was installed at the location of a disused timber merchant's yard approximately 400 metres from the start of the drive. Information was sought on the inter-relationship between tunnel construction processes and ground response in order to improve specifications and to enhance construction control. The data collected will be used in the calibration of finite element and analytical methods being developed by Brown & Root in collaboration with Cambridge University. This paper describes an assessment of the behaviour of London Clay during the passage of the TBM. Representative plots of the results and interpretation relevant to future prediction of ground response to tunnelling using this type of TBM are also described. For the covering abstract see IRRD E102185.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A 2.8 metre outer diameter cable tunnel, 1.75km in length, has been driven using a closed face Tunnel Boring Machine (TBM), from West Ham to the Greenwich Peninsula in East London, to provide power to the site of the Millennium Dome. The choice of tunnelling to install electricity cables, rather than open trenching techniques, was made in order to minimise the potential disruption in London's congested urban environment. The construction of cable tunnels for the client (London Electricity plc) has facilitated the on-going modernisation programme of this important element of the city's infrastructure. In order to gain field data relating to the behaviour of London Clay around an advancing tunnel and at the same time to progress current in-house research initiatives, Brown & Root took the opportunity to establish a monitoring site in advance of the tunnel construction. Surface and sub-surface instrumentation was installed at the location of a disused timber merchant's yard approximately 400 metres from the start of the drive. Information was sought on the inter-relationship between tunnel construction processes and ground response in order to improve specifications and to enhance construction control. The data collected will be used in the calibration of finite element and analytical methods being developed by Brown & Root in collaboration with Cambridge University. This paper describes an assessment of the behaviour of London Clay during the passage of the TBM. Representative plots of the results and interpretation relevant to future prediction of ground response to tunnelling using this type of TBM are also described. For the covering abstract see IRRD E102185.
Key concepts: Engineering, Greenwich, New Austrian Tunnelling method, Civil engineering, Quantum tunnelling, Geotechnical engineering, Geology, Excavation