2014•Geomechanics and TunnellingRequires access

TBM and spoil treatment selection process – case history Crossrail C310 Thames Tunnel

Rainer Rengshausen, Riku Tauriainen, Andreas Raedle

Open publisher page 5 citations

Abstract

Abstract Slurry TBM versus EPB TBM The contract C310 comprises the construction of the Plumstead and North Woolwich Portals and the twin tube Thames Tunnel, which has a length of approximately 2.6 km between the two portals. The two TBMs used for the construction of the Thames Tunnel will drive through varying ground conditions (Thanet Sand, River Terrace Deposit (gravel), and chalk) below the water table. During the drive under the River Thames, the tunnels will only have an overburden of approximately 12 m. The effect of pressure variation due to the tidal River Thames has to be accounted for in the control of the tunnelling. The tunnel will pass underneath several grade II listed buildings, utilities, adjacent to operational railway tracks and close to existing subway tunnels. Previous experience of the handling and disposal of excavated chalk has been gained on several tunnelling projects in chalk, most notably the Dartford Road Tunnels, the Channel Tunnel, the Brighton Stormwater Tunnel, the Lille Metro Tunnel, the Socatop Road Tunnel near Paris and Channel Tunnel Rail Link CTRL 320. The Contract allowed for both Mixshield and EPB TBM Technology. The advantages and disadvantages of a TBM‐S with Earth Pressure Balanced face support (EPB‐TBM) and a TBM‐S with Slurry Face support (Mix‐Shield TBM) for the C310 Thames Tunnels were discussed after contract award and a comparative risk assessment was developed. A Mixshield TBM is more expensive but outperformed the EPB TBM in the overall scoring of risk assessment and therefore it has been decided to use this type at C310.

About this research paper

What this paper is about

Abstract Slurry TBM versus EPB TBM The contract C310 comprises the construction of the Plumstead and North Woolwich Portals and the twin tube Thames Tunnel, which has a length of approximately 2.6 km between the two portals. The two TBMs used for the construction of the Thames Tunnel will drive through varying ground conditions (Thanet Sand, River Terrace Deposit (gravel), and chalk) below the water table. During the drive under the River Thames, the tunnels will only have an overburden of approximately 12 m. The effect of pressure variation due to the tidal River Thames has to be accounted for in the control of the tunnelling. The tunnel will pass underneath several grade II listed buildings, utilities, adjacent to operational railway tracks and close to existing subway tunnels. Previous experience of the handling and disposal of excavated chalk has been gained on several tunnelling projects in chalk, most notably the Dartford Road Tunnels, the Channel Tunnel, the Brighton Stormwater Tunnel, the Lille Metro Tunnel, the Socatop Road Tunnel near Paris and Channel Tunnel Rail Link CTRL 320. The Contract allowed for both Mixshield and EPB TBM Technology. The advantages and disadvantages of a TBM‐S with Earth Pressure Balanced face support (EPB‐TBM) and a TBM‐S with Slurry Face support (Mix‐Shield TBM) for the C310 Thames Tunnels were discussed after contract award and a comparative risk assessment was developed. A Mixshield TBM is more expensive but outperformed the EPB TBM in the overall scoring of risk assessment and therefore it has been decided to use this type at C310.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Slurry TBM versus EPB TBM The contract C310 comprises the construction of the Plumstead and North Woolwich Portals and the twin tube Thames Tunnel, which has a length of approximately 2.6 km between the two portals. The two TBMs used for the construction of the Thames Tunnel will drive through varying ground conditions (Thanet Sand, River Terrace Deposit (gravel), and chalk) below the water table. During the drive under the River Thames, the tunnels will only have an overburden of approximately 12 m. The effect of pressure variation due to the tidal River Thames has to be accounted for in the control of the tunnelling. The tunnel will pass underneath several grade II listed buildings, utilities, adjacent to operational railway tracks and close to existing subway tunnels. Previous experience of the handling and disposal of excavated chalk has been gained on several tunnelling projects in chalk, most notably the Dartford Road Tunnels, the Channel Tunnel, the Brighton Stormwater Tunnel, the Lille Metro Tunnel, the Socatop Road Tunnel near Paris and Channel Tunnel Rail Link CTRL 320. The Contract allowed for both Mixshield and EPB TBM Technology. The advantages and disadvantages of a TBM‐S with Earth Pressure Balanced face support (EPB‐TBM) and a TBM‐S with Slurry Face support (Mix‐Shield TBM) for the C310 Thames Tunnels were discussed after contract award and a comparative risk assessment was developed. A Mixshield TBM is more expensive but outperformed the EPB TBM in the overall scoring of risk assessment and therefore it has been decided to use this type at C310.

Key concepts: Channel tunnel, Overburden, Shield, Channel (broadcasting), Mining engineering, Engineering, Geotechnical engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
TBM and spoil treatment selection process – case history Crossrail C310 Thames Tunnel — Research Paper | ScholarLens