1991Unpublished venueRequires access

QUEENS-MANHATTAN TRANSIT IMPROVEMENTS STUDY. FINAL REPORT

Herbert S. Levinson, Robert A. Olmsted

Open publisher page 0 citations

Abstract

This report analyzes short and long range opportunities for improving subway service between Queens and Manhattan. It evaluates the physical feasibility, operating feasibility, ridership potential, capacities, costs, and institutional acceptability of more than 20 options. The report recommends a staged improvement plan the first stage calls for (1) operating 60-foot cars on the Queens Boulevard subway line, (2) speeding up J-Z service by closing or consolidating stations, (3) improving pedestrian connections in Long Island City and (4) building a Rosedale Transit Center. It supports the following sequence of actions over the next 10 to 15 years; (1) complete the Northern Boulevard express-local connection as soon as possible, (2) connect the 60th Street tunnel to the Flushing Line ezpress track, (3) utilize a car capable of running on both tracks, and (4) subsequently (as needed) add a fifth track through the Roosevelt Avenue stations and build connection between the Queens Boulevard and Rockaway Lines. A connection between the Long Island Rail Road main line and the 63rd Street tunnel lower level with an extension of LIRR service to midtown Manhattan has merit over the long run as part of regional transit improvements.

About this research paper

What this paper is about

This report analyzes short and long range opportunities for improving subway service between Queens and Manhattan. It evaluates the physical feasibility, operating feasibility, ridership potential, capacities, costs, and institutional acceptability of more than 20 options. The report recommends a staged improvement plan the first stage calls for (1) operating 60-foot cars on the Queens Boulevard subway line, (2) speeding up J-Z service by closing or consolidating stations, (3) improving pedestrian connections in Long Island City and (4) building a Rosedale Transit Center. It supports the following sequence of actions over the next 10 to 15 years; (1) complete the Northern Boulevard express-local connection as soon as possible, (2) connect the 60th Street tunnel to the Flushing Line ezpress track, (3) utilize a car capable of running on both tracks, and (4) subsequently (as needed) add a fifth track through the Roosevelt Avenue stations and build connection between the Queens Boulevard and Rockaway Lines. A connection between the Long Island Rail Road main line and the 63rd Street tunnel lower level with an extension of LIRR service to midtown Manhattan has merit over the long run as part of regional transit improvements.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This report analyzes short and long range opportunities for improving subway service between Queens and Manhattan. It evaluates the physical feasibility, operating feasibility, ridership potential, capacities, costs, and institutional acceptability of more than 20 options. The report recommends a staged improvement plan the first stage calls for (1) operating 60-foot cars on the Queens Boulevard subway line, (2) speeding up J-Z service by closing or consolidating stations, (3) improving pedestrian connections in Long Island City and (4) building a Rosedale Transit Center. It supports the following sequence of actions over the next 10 to 15 years; (1) complete the Northern Boulevard express-local connection as soon as possible, (2) connect the 60th Street tunnel to the Flushing Line ezpress track, (3) utilize a car capable of running on both tracks, and (4) subsequently (as needed) add a fifth track through the Roosevelt Avenue stations and build connection between the Queens Boulevard and Rockaway Lines. A connection between the Long Island Rail Road main line and the 63rd Street tunnel lower level with an extension of LIRR service to midtown Manhattan has merit over the long run as part of regional transit improvements.

Key concepts: Boulevard, Transport engineering, Service (business), Transit (satellite), Pedestrian, Track (disk drive), Plan (archaeology), Public transport

Related papers

Back to paper searchBrowse research topicsOriginal source
QUEENS-MANHATTAN TRANSIT IMPROVEMENTS STUDY. FINAL REPORT — Research Paper | ScholarLens