A CHALLENGE FOR THE ATHENS PUBLIC TRANSPORT SYSTEM
Y Patrikalakis
Abstract
Y Patrikalakis
Abstract
The challenges posed by the Athens 2004 Olympic Games in Greece to the Athens public transport system are examined. The preparatory actions taken by Athens Urban Transport Organization (OASA), the metropolitan transport authority in the Greater Athens area, and its affiliated companies (ETHEL, ILPAP, ISAP, AMEL, TRAM, PROASTIAKOS) to expand bus, trolley bus, metro, tram and suburban rail services are described. It was decided that spectators and workers would approach Olympic installations exclusively with public transport. Details are given of the Olympic Games Operational Plan and the Olympic Network Concept, priority measures (bus lanes), rolling stock and infrastructure, crowd management, contingency planning and integrated traffic management (traffic control signalling system, closed circuit television cameras, variable message signs).
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The challenges posed by the Athens 2004 Olympic Games in Greece to the Athens public transport system are examined. The preparatory actions taken by Athens Urban Transport Organization (OASA), the metropolitan transport authority in the Greater Athens area, and its affiliated companies (ETHEL, ILPAP, ISAP, AMEL, TRAM, PROASTIAKOS) to expand bus, trolley bus, metro, tram and suburban rail services are described. It was decided that spectators and workers would approach Olympic installations exclusively with public transport. Details are given of the Olympic Games Operational Plan and the Olympic Network Concept, priority measures (bus lanes), rolling stock and infrastructure, crowd management, contingency planning and integrated traffic management (traffic control signalling system, closed circuit television cameras, variable message signs).
Key concepts: Public transport, Metropolitan area, Transport engineering, Contingency plan, Plan (archaeology), Business, Engineering, Geography