Leading Them to Water: New Bridge Carrying I-35W Will Offer More to the Community
Bill Wilson
Abstract
Bill Wilson
Abstract
In the aftermath of the collapse of the I-35W Bridge in Minneapolis, the reconstruction job is proceeding under a very tight schedule. This article discusses key aspects of the pre-construction planning and solicitation of feedback from community members living near the site, as well as the structure of the design-build contract. A charette was used to present two final options, both featuring hourglass-shaped piers standing about 70 feet tall. Shared elements also include a waterfront observation area, the preservation of an historic railroad abutment wall and the option of constructing a pedestrian bridge below. Among the many challenges is the 20-foot clearance envelope, the need to correct the geometry of the highway, and a 13-month schedule, which will run through the cold Minnesota winter. Actual erection will be done by one-directional cantilever construction. Foundation work has started and will continue through March, though pier construction will start in February 2008.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In the aftermath of the collapse of the I-35W Bridge in Minneapolis, the reconstruction job is proceeding under a very tight schedule. This article discusses key aspects of the pre-construction planning and solicitation of feedback from community members living near the site, as well as the structure of the design-build contract. A charette was used to present two final options, both featuring hourglass-shaped piers standing about 70 feet tall. Shared elements also include a waterfront observation area, the preservation of an historic railroad abutment wall and the option of constructing a pedestrian bridge below. Among the many challenges is the 20-foot clearance envelope, the need to correct the geometry of the highway, and a 13-month schedule, which will run through the cold Minnesota winter. Actual erection will be done by one-directional cantilever construction. Foundation work has started and will continue through March, though pier construction will start in February 2008.
Key concepts: Pier, Bridge (graph theory), Engineering, Schedule, Abutment, Pedestrian, Civil engineering, Work (physics)