Leading Them to Water: New Bridge Carrying I-35W Will Offer More to the Community

Bill Wilson

Open publisher page 0 citations

Abstract

In the aftermath of the collapse of the I-35W Bridge in Minneapolis, the reconstruction job is proceeding under a very tight schedule. This article discusses key aspects of the pre-construction planning and solicitation of feedback from community members living near the site, as well as the structure of the design-build contract. A charette was used to present two final options, both featuring hourglass-shaped piers standing about 70 feet tall. Shared elements also include a waterfront observation area, the preservation of an historic railroad abutment wall and the option of constructing a pedestrian bridge below. Among the many challenges is the 20-foot clearance envelope, the need to correct the geometry of the highway, and a 13-month schedule, which will run through the cold Minnesota winter. Actual erection will be done by one-directional cantilever construction. Foundation work has started and will continue through March, though pier construction will start in February 2008.

About this research paper

What this paper is about

In the aftermath of the collapse of the I-35W Bridge in Minneapolis, the reconstruction job is proceeding under a very tight schedule. This article discusses key aspects of the pre-construction planning and solicitation of feedback from community members living near the site, as well as the structure of the design-build contract. A charette was used to present two final options, both featuring hourglass-shaped piers standing about 70 feet tall. Shared elements also include a waterfront observation area, the preservation of an historic railroad abutment wall and the option of constructing a pedestrian bridge below. Among the many challenges is the 20-foot clearance envelope, the need to correct the geometry of the highway, and a 13-month schedule, which will run through the cold Minnesota winter. Actual erection will be done by one-directional cantilever construction. Foundation work has started and will continue through March, though pier construction will start in February 2008.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In the aftermath of the collapse of the I-35W Bridge in Minneapolis, the reconstruction job is proceeding under a very tight schedule. This article discusses key aspects of the pre-construction planning and solicitation of feedback from community members living near the site, as well as the structure of the design-build contract. A charette was used to present two final options, both featuring hourglass-shaped piers standing about 70 feet tall. Shared elements also include a waterfront observation area, the preservation of an historic railroad abutment wall and the option of constructing a pedestrian bridge below. Among the many challenges is the 20-foot clearance envelope, the need to correct the geometry of the highway, and a 13-month schedule, which will run through the cold Minnesota winter. Actual erection will be done by one-directional cantilever construction. Foundation work has started and will continue through March, though pier construction will start in February 2008.

Key concepts: Pier, Bridge (graph theory), Engineering, Schedule, Abutment, Pedestrian, Civil engineering, Work (physics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Leading Them to Water: New Bridge Carrying I-35W Will Offer More to the Community — Research Paper | ScholarLens