INVESTIGATION OF CONCRETE PAVEMENT PUMPING-OHIO
H L Krauser
Abstract
H L Krauser
Abstract
TRANSVERSE JOINT PUMPING ON A SECTION OF ROUTE 52 WAS OBSERVED AFTER 2 TO 3 MONTHS; IT INCREASED RAPIDLY. PUMPING WAS MUCH MORE EXTENSIVE AND SEVERE WHEN THE PAVEMENT SLAB WAS PLACED ON SOIL SUBGRADE. GREATER DEFLECTION WAS NOTED WHEN TRUCKS PROCEEDED AT SLOWER THAN NORMAL SPEEDS.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
TRANSVERSE JOINT PUMPING ON A SECTION OF ROUTE 52 WAS OBSERVED AFTER 2 TO 3 MONTHS; IT INCREASED RAPIDLY. PUMPING WAS MUCH MORE EXTENSIVE AND SEVERE WHEN THE PAVEMENT SLAB WAS PLACED ON SOIL SUBGRADE. GREATER DEFLECTION WAS NOTED WHEN TRUCKS PROCEEDED AT SLOWER THAN NORMAL SPEEDS.
Key concepts: Subgrade, Truck, Deflection (physics), Slab, Geotechnical engineering, Forensic engineering, Geology, Engineering