MAINTENANCE OF JOINTS IN CONCRETE PAVEMENTS AS RELATED TO THE PUMPING ACTION OF THE SLABS

R M Whitton

Open publisher page 1 citations

Abstract

THE CORRECTION OF PUMPING AT JOINTS IN CONCRETE PAVEMENTS, BY THE USE OF A SEMIFLUID SOIL-CEMENT MIXTURE FORCED UNDER THE SLAB WITH A MUDJACK IS DESCRIBED. THE SLURRY USED CONSISTED OF FOUR SACKS OF CEMENT PER CUBIC YARD OF TOPSOIL AND 50 TO 55% WATER. THE SPACING OF THE HOLES FOR ELIMINATION OF PUMPING AND CORRECTION OF FAULTING IS DISCUSSED. THE EQUIPMENT AND PERSONNEL REQUIRED IS GIVEN IN DETAIL. IN A STUDY OF THE DEFLECTIONS OF THE PAVEMENT UNDER MOVING LOADS, IT WAS NOTED THAT DEFLECTIONS INCREASED IMMEDIATELY AFTER FILLING THE VOIDS UNDER THE PAVEMENT WITH THE SOIL-CEMENT SLURRY AND THEN DECREASED AFTER A PERIOD OF TIME HAD ELAPSED. IT WAS FOUND THAT A FEW OF THE MUDJACKED SLABS RESUMED PUMPING AND THAT THE WORK HAD TO BE SUPPLEMENTED WITH JOINT AND CRACK WATER-PROOFING TO KEEP SURFACE WATER FROM REACHING THE SUBGRADE. ON PAVEMENTS THAT WERE CRACKED EXTENSIVELY, THE BEST METHOD OF WATERPROOFING JOINTS WAS BY THE USE OF A SUBSTANTIAL BITUMINOUS SURFACE OR UPPER DECK NOT LESS THAN 1-IN. IN THICKNESS. AFTER A STUDY OF DESIGN FEATURES FROM THE VIEWPOINT OF A MAINTENANCE ENGINEER, THE AUTHOR CONCLUDES THAT EXPANSION OR CONTRACTION JOINTS SHOULD NOT BE USED IN CONCRETE PAVEMENTS EXCEPT AT HIGHWAY INTERSECTIONS, BRIDGE ENDS OR OTHER LOCATIONS WHERE THE PAVEMENT ABUTTS A FIXED OBJECT. THE RELATION OF THE TYPE OF AGGREGATE TO THE CRACK INTERVAL IN CONCRETE PAVEMENTS IN WHICH NO JOINTS WERE PLACED IS DISCUSSED. /AUTHOR/

About this research paper

What this paper is about

THE CORRECTION OF PUMPING AT JOINTS IN CONCRETE PAVEMENTS, BY THE USE OF A SEMIFLUID SOIL-CEMENT MIXTURE FORCED UNDER THE SLAB WITH A MUDJACK IS DESCRIBED. THE SLURRY USED CONSISTED OF FOUR SACKS OF CEMENT PER CUBIC YARD OF TOPSOIL AND 50 TO 55% WATER. THE SPACING OF THE HOLES FOR ELIMINATION OF PUMPING AND CORRECTION OF FAULTING IS DISCUSSED. THE EQUIPMENT AND PERSONNEL REQUIRED IS GIVEN IN DETAIL. IN A STUDY OF THE DEFLECTIONS OF THE PAVEMENT UNDER MOVING LOADS, IT WAS NOTED THAT DEFLECTIONS INCREASED IMMEDIATELY AFTER FILLING THE VOIDS UNDER THE PAVEMENT WITH THE SOIL-CEMENT SLURRY AND THEN DECREASED AFTER A PERIOD OF TIME HAD ELAPSED. IT WAS FOUND THAT A FEW OF THE MUDJACKED SLABS RESUMED PUMPING AND THAT THE WORK HAD TO BE SUPPLEMENTED WITH JOINT AND CRACK WATER-PROOFING TO KEEP SURFACE WATER FROM REACHING THE SUBGRADE. ON PAVEMENTS THAT WERE CRACKED EXTENSIVELY, THE BEST METHOD OF WATERPROOFING JOINTS WAS BY THE USE OF A SUBSTANTIAL BITUMINOUS SURFACE OR UPPER DECK NOT LESS THAN 1-IN. IN THICKNESS. AFTER A STUDY OF DESIGN FEATURES FROM THE VIEWPOINT OF A MAINTENANCE ENGINEER, THE AUTHOR CONCLUDES THAT EXPANSION OR CONTRACTION JOINTS SHOULD NOT BE USED IN CONCRETE PAVEMENTS EXCEPT AT HIGHWAY INTERSECTIONS, BRIDGE ENDS OR OTHER LOCATIONS WHERE THE PAVEMENT ABUTTS A FIXED OBJECT. THE RELATION OF THE TYPE OF AGGREGATE TO THE CRACK INTERVAL IN CONCRETE PAVEMENTS IN WHICH NO JOINTS WERE PLACED IS DISCUSSED. /AUTHOR/

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THE CORRECTION OF PUMPING AT JOINTS IN CONCRETE PAVEMENTS, BY THE USE OF A SEMIFLUID SOIL-CEMENT MIXTURE FORCED UNDER THE SLAB WITH A MUDJACK IS DESCRIBED. THE SLURRY USED CONSISTED OF FOUR SACKS OF CEMENT PER CUBIC YARD OF TOPSOIL AND 50 TO 55% WATER. THE SPACING OF THE HOLES FOR ELIMINATION OF PUMPING AND CORRECTION OF FAULTING IS DISCUSSED. THE EQUIPMENT AND PERSONNEL REQUIRED IS GIVEN IN DETAIL. IN A STUDY OF THE DEFLECTIONS OF THE PAVEMENT UNDER MOVING LOADS, IT WAS NOTED THAT DEFLECTIONS INCREASED IMMEDIATELY AFTER FILLING THE VOIDS UNDER THE PAVEMENT WITH THE SOIL-CEMENT SLURRY AND THEN DECREASED AFTER A PERIOD OF TIME HAD ELAPSED. IT WAS FOUND THAT A FEW OF THE MUDJACKED SLABS RESUMED PUMPING AND THAT THE WORK HAD TO BE SUPPLEMENTED WITH JOINT AND CRACK WATER-PROOFING TO KEEP SURFACE WATER FROM REACHING THE SUBGRADE. ON PAVEMENTS THAT WERE CRACKED EXTENSIVELY, THE BEST METHOD OF WATERPROOFING JOINTS WAS BY THE USE OF A SUBSTANTIAL BITUMINOUS SURFACE OR UPPER DECK NOT LESS THAN 1-IN. IN THICKNESS. AFTER A STUDY OF DESIGN FEATURES FROM THE VIEWPOINT OF A MAINTENANCE ENGINEER, THE AUTHOR CONCLUDES THAT EXPANSION OR CONTRACTION JOINTS SHOULD NOT BE USED IN CONCRETE PAVEMENTS EXCEPT AT HIGHWAY INTERSECTIONS, BRIDGE ENDS OR OTHER LOCATIONS WHERE THE PAVEMENT ABUTTS A FIXED OBJECT. THE RELATION OF THE TYPE OF AGGREGATE TO THE CRACK INTERVAL IN CONCRETE PAVEMENTS IN WHICH NO JOINTS WERE PLACED IS DISCUSSED. /AUTHOR/

Key concepts: Geotechnical engineering, Subgrade, Waterproofing, Expansion joint, Cement, Deck, Slab, Joint (building)

Related papers

Back to paper searchBrowse research topicsOriginal source
MAINTENANCE OF JOINTS IN CONCRETE PAVEMENTS AS RELATED TO THE PUMPING ACTION OF THE SLABS — Research Paper | ScholarLens