This article describes the construction work on the Gateway Bridge, Brisbane. The bridge has a main span of 260 m with with balanced cantilevers of 130 m either side of the river piers. The river structure is a cast in situ concrete box girder constructed by balanced cantilevering from pier 6 and pier 7. The main span of 260 m is some 20 m longer than the longest box girder previously built anywhere in the world.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This article describes the construction work on the Gateway Bridge, Brisbane. The bridge has a main span of 260 m with with balanced cantilevers of 130 m either side of the river piers. The river structure is a cast in situ concrete box girder constructed by balanced cantilevering from pier 6 and pier 7. The main span of 260 m is some 20 m longer than the longest box girder previously built anywhere in the world.
Key concepts: Pier, Bridge (graph theory), Box girder, Span (engineering), Gateway (web page), Engineering, Structural engineering, Beam bridge