TEST PILING PROGRAM FOR BRIDGES ON THE SUNSHINE MOTORWAY IN QUEENSLAND . 15TH ARRB CONFRRENCE, DARWIN, NORTHERN TERRITORY, 26-31 AUGUST 1990; PROCEEDINGS PARTS 1 TO 7

Russell John Steele, Julian P. Seidel, D Klingberg

Open publisher page 0 citations

Abstract

The Sunshine Coast, the coastal region of Queensland just north of Brisbane, has experienced substantial growth in residential, commercial and light industrial development over the last decade. By the early 1980s it had become apparent that the road system within the area was unable to cope with the existing traffic, particularly during peak holiday periods. The Sunshine Motorway was proposed as a means of providing the road infrastructure necessary to significantly improve road conditions and to encourage future development of the Sunshine Coast area. Stage 1 of the Motorway was constructed using the 'fast track' approach and was opened to traffic in January 1990. The Motorway will be operated as a tollway. Eighteen bridges were constructed in Stage 1 of the Sunshine Motorway. Foundation investigation at several bridge sites revealed significant depths (> 50 m) of alluvial deposits. A test piling program using square reinforced concrete 'Balken' piles and the Pile Driving Analyser was carried out at these sites to establish optimum founding levels. Concurrent with the above program, the opportunity was taken to test the feasibility of driving long spliced piles consisting of an upper prestressed concrete pile section connected via the Balken mechanical joint to a lower 'Balken' reinforced concrete pile section. Two sustained load static tests were also carried out in accordance with AS 2159 - 1978 'SAA Piling Code'. (Author/TRRL)

About this research paper

What this paper is about

The Sunshine Coast, the coastal region of Queensland just north of Brisbane, has experienced substantial growth in residential, commercial and light industrial development over the last decade. By the early 1980s it had become apparent that the road system within the area was unable to cope with the existing traffic, particularly during peak holiday periods. The Sunshine Motorway was proposed as a means of providing the road infrastructure necessary to significantly improve road conditions and to encourage future development of the Sunshine Coast area. Stage 1 of the Motorway was constructed using the 'fast track' approach and was opened to traffic in January 1990. The Motorway will be operated as a tollway. Eighteen bridges were constructed in Stage 1 of the Sunshine Motorway. Foundation investigation at several bridge sites revealed significant depths (> 50 m) of alluvial deposits. A test piling program using square reinforced concrete 'Balken' piles and the Pile Driving Analyser was carried out at these sites to establish optimum founding levels. Concurrent with the above program, the opportunity was taken to test the feasibility of driving long spliced piles consisting of an upper prestressed concrete pile section connected via the Balken mechanical joint to a lower 'Balken' reinforced concrete pile section. Two sustained load static tests were also carried out in accordance with AS 2159 - 1978 'SAA Piling Code'. (Author/TRRL)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Sunshine Coast, the coastal region of Queensland just north of Brisbane, has experienced substantial growth in residential, commercial and light industrial development over the last decade. By the early 1980s it had become apparent that the road system within the area was unable to cope with the existing traffic, particularly during peak holiday periods. The Sunshine Motorway was proposed as a means of providing the road infrastructure necessary to significantly improve road conditions and to encourage future development of the Sunshine Coast area. Stage 1 of the Motorway was constructed using the 'fast track' approach and was opened to traffic in January 1990. The Motorway will be operated as a tollway. Eighteen bridges were constructed in Stage 1 of the Sunshine Motorway. Foundation investigation at several bridge sites revealed significant depths (> 50 m) of alluvial deposits. A test piling program using square reinforced concrete 'Balken' piles and the Pile Driving Analyser was carried out at these sites to establish optimum founding levels. Concurrent with the above program, the opportunity was taken to test the feasibility of driving long spliced piles consisting of an upper prestressed concrete pile section connected via the Balken mechanical joint to a lower 'Balken' reinforced concrete pile section. Two sustained load static tests were also carried out in accordance with AS 2159 - 1978 'SAA Piling Code'. (Author/TRRL)

Key concepts: Pile, Engineering, Environmental science, Geotechnical engineering, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
TEST PILING PROGRAM FOR BRIDGES ON THE SUNSHINE MOTORWAY IN QUEENSLAND . 15TH ARRB CONFRRENCE, DARWIN, NORTHERN TERRITORY, 26-31 AUGUST 1990; PROCEEDINGS PARTS 1 TO 7 — Research Paper | ScholarLens