MISSION VALLEY WEST LRT EXTENSION PROJECT ALIGNMENT CHALLENGES

J. L. Hecht, Jay R. Galbraith

Open publisher page 0 citations

Abstract

This paper reviews the history of design challenges on San Diego Metropolitan Transit Development Board's (MTDB) most formidable venture to date. The 6 mile (9.6 km) light rail transit (LRT) extension into west Mission Valley is located entirely outside of existing railroad right of way. In some areas, the alignment was carved through private properties that were completely developed and in other areas, through properties planned for future development. Acquisition of property from the City of San Diego and coordinating with Caltrans on four major highway crossings demonstrated public resolve for a successful project.

About this research paper

What this paper is about

This paper reviews the history of design challenges on San Diego Metropolitan Transit Development Board's (MTDB) most formidable venture to date. The 6 mile (9.6 km) light rail transit (LRT) extension into west Mission Valley is located entirely outside of existing railroad right of way. In some areas, the alignment was carved through private properties that were completely developed and in other areas, through properties planned for future development. Acquisition of property from the City of San Diego and coordinating with Caltrans on four major highway crossings demonstrated public resolve for a successful project.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper reviews the history of design challenges on San Diego Metropolitan Transit Development Board's (MTDB) most formidable venture to date. The 6 mile (9.6 km) light rail transit (LRT) extension into west Mission Valley is located entirely outside of existing railroad right of way. In some areas, the alignment was carved through private properties that were completely developed and in other areas, through properties planned for future development. Acquisition of property from the City of San Diego and coordinating with Caltrans on four major highway crossings demonstrated public resolve for a successful project.

Key concepts: Metropolitan area, Transit (satellite), Extension (predicate logic), Light rail transit, Public transport, Transport engineering, Geography, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
MISSION VALLEY WEST LRT EXTENSION PROJECT ALIGNMENT CHALLENGES — Research Paper | ScholarLens