1976•Unpublished venueRequires access

MONEY-SAVING TUNNEL JACKING LEAVES RAILROAD UNDISTURBED

A A Pedersen

Open publisher page 0 citations

Abstract

The paper reports how with excavation advancing immediately ahead of them, tunneling crews jacked a 6-lane highway tunnel forward into position beneath a four-track rail line without disrupting rail traffic.

About this research paper

What this paper is about

The paper reports how with excavation advancing immediately ahead of them, tunneling crews jacked a 6-lane highway tunnel forward into position beneath a four-track rail line without disrupting rail traffic.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper reports how with excavation advancing immediately ahead of them, tunneling crews jacked a 6-lane highway tunnel forward into position beneath a four-track rail line without disrupting rail traffic.

Key concepts: Jacking, Forensic engineering, Business, Geology, Economics, Engineering, History, Performance art

Related papers

Back to paper searchBrowse research topicsOriginal source
MONEY-SAVING TUNNEL JACKING LEAVES RAILROAD UNDISTURBED — Research Paper | ScholarLens