TUNNELLING UNDER THE LINE

P Reina

Open publisher page 0 citations

Abstract

This article reports on the construction of a road tunnel in Essex, under a busy commuter rail line to London, which links a new housing estate to a large shopping centre. When complete, the tunnel will pierce a British Rail embankment just east of the M25 motorway near the River Thames. The technique of thrust boring was the obvious choice. A 5000 tonnes precast section was pushed through the embankment by a battery of hydraulic rams; it is 16.5m wide, 9.5m high, 30m long, and its walls are over 1m thick. All the jacks were placed at the rear, and the load was reduced by lubricating the box, by running hundreds of small-diameter steel ropes along the top and bottom surfaces separating the earth from the concrete. Construction was started by building a large concrete ground slab next to the embankment; it acted as the casting base for the tunnel box and an anchor for the jacks. For the jacking operation, five strong steel columns were placed against the tunnel box's rear end. Because of the elaborate preparatory construction, the contractor took less time than the planned fortnight to move the box 32m without stopping the trains running on the railway above. (TRRL)

About this research paper

What this paper is about

This article reports on the construction of a road tunnel in Essex, under a busy commuter rail line to London, which links a new housing estate to a large shopping centre. When complete, the tunnel will pierce a British Rail embankment just east of the M25 motorway near the River Thames. The technique of thrust boring was the obvious choice. A 5000 tonnes precast section was pushed through the embankment by a battery of hydraulic rams; it is 16.5m wide, 9.5m high, 30m long, and its walls are over 1m thick. All the jacks were placed at the rear, and the load was reduced by lubricating the box, by running hundreds of small-diameter steel ropes along the top and bottom surfaces separating the earth from the concrete. Construction was started by building a large concrete ground slab next to the embankment; it acted as the casting base for the tunnel box and an anchor for the jacks. For the jacking operation, five strong steel columns were placed against the tunnel box's rear end. Because of the elaborate preparatory construction, the contractor took less time than the planned fortnight to move the box 32m without stopping the trains running on the railway above. (TRRL)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article reports on the construction of a road tunnel in Essex, under a busy commuter rail line to London, which links a new housing estate to a large shopping centre. When complete, the tunnel will pierce a British Rail embankment just east of the M25 motorway near the River Thames. The technique of thrust boring was the obvious choice. A 5000 tonnes precast section was pushed through the embankment by a battery of hydraulic rams; it is 16.5m wide, 9.5m high, 30m long, and its walls are over 1m thick. All the jacks were placed at the rear, and the load was reduced by lubricating the box, by running hundreds of small-diameter steel ropes along the top and bottom surfaces separating the earth from the concrete. Construction was started by building a large concrete ground slab next to the embankment; it acted as the casting base for the tunnel box and an anchor for the jacks. For the jacking operation, five strong steel columns were placed against the tunnel box's rear end. Because of the elaborate preparatory construction, the contractor took less time than the planned fortnight to move the box 32m without stopping the trains running on the railway above. (TRRL)

Key concepts: Precast concrete, Jacking, Levee, Engineering, Culvert, Slab, Laying, Railway line

Related papers

Back to paper searchBrowse research topicsOriginal source
TUNNELLING UNDER THE LINE — Research Paper | ScholarLens