METRO'S $2.1-BILLION GAMBLE
T Ichniowski
Abstract
T Ichniowski
Abstract
In Maryland, Virginia, and the District of Columbia, the Washington Metropolitan Area Transit Authority (WMATA) is on a $2.1-billion fast track to complete 21.7 km (13.5 mi) of rapid transit routes 5 years early. WMATA will realize a $600 million savings if the five fast track projects are completed on schedule. This article describes the individual projects and the construction and tunneling technology being applied.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In Maryland, Virginia, and the District of Columbia, the Washington Metropolitan Area Transit Authority (WMATA) is on a $2.1-billion fast track to complete 21.7 km (13.5 mi) of rapid transit routes 5 years early. WMATA will realize a $600 million savings if the five fast track projects are completed on schedule. This article describes the individual projects and the construction and tunneling technology being applied.
Key concepts: Metropolitan area, Track (disk drive), Transit (satellite), Schedule, Transport engineering, Geography, Public transport, Engineering