DESIGN AND CONSTRUCTION OF THE A20 ROUND HILL TUNNELS

Peter Murphy, N L Harrison, A. G. Myers

Open publisher page 3 citations

Abstract

This article reports on a British Tunnelling Society meeting where the first use of the New Austrian Tunnelling Method (NATM) on a UK road tunnel was described and discussed. The tunnels, which form part of the A20 improvement between Folkestone and Dover, are each 380m long, accomodate 2 lanes of traffic and an emergency walkway, and are constructed on a 3.5% decline through Lower Chalk. Presentations by the consultant and contractor gave details of the geology of the area, spilling, excavation techniques, primary and secondary support, machinery used and in-tunnel monitoring. The discussion which followed focussed on various aspects of NATM.

About this research paper

What this paper is about

This article reports on a British Tunnelling Society meeting where the first use of the New Austrian Tunnelling Method (NATM) on a UK road tunnel was described and discussed. The tunnels, which form part of the A20 improvement between Folkestone and Dover, are each 380m long, accomodate 2 lanes of traffic and an emergency walkway, and are constructed on a 3.5% decline through Lower Chalk. Presentations by the consultant and contractor gave details of the geology of the area, spilling, excavation techniques, primary and secondary support, machinery used and in-tunnel monitoring. The discussion which followed focussed on various aspects of NATM.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article reports on a British Tunnelling Society meeting where the first use of the New Austrian Tunnelling Method (NATM) on a UK road tunnel was described and discussed. The tunnels, which form part of the A20 improvement between Folkestone and Dover, are each 380m long, accomodate 2 lanes of traffic and an emergency walkway, and are constructed on a 3.5% decline through Lower Chalk. Presentations by the consultant and contractor gave details of the geology of the area, spilling, excavation techniques, primary and secondary support, machinery used and in-tunnel monitoring. The discussion which followed focussed on various aspects of NATM.

Key concepts: New Austrian Tunnelling method, Excavation, Engineering, Railway tunnel, Civil engineering, Roadheader, Road construction, Forensic engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
DESIGN AND CONSTRUCTION OF THE A20 ROUND HILL TUNNELS — Research Paper | ScholarLens