Trunk road 55: lithgow to gulgong

Allan Piper

Open publisher page 0 citations

Abstract

On 30 and 31 may, 1985 the traffic and safety department of the nrma conducted a survey of trunk road 55 from the great western highway north to gulgong. The survey indicated a high proportion of narrow pavement and shoulders, and many lengths of substandard pavement, shoulders and pavement edges. Various other works, including the construction of additional overtaking lanes, and bridge and subway widenings, were also required. As with the previous 1977 survey, it was concluded that a large increase in available funds is required to upgrade this road to an adequate standard (a).

About this research paper

What this paper is about

On 30 and 31 may, 1985 the traffic and safety department of the nrma conducted a survey of trunk road 55 from the great western highway north to gulgong. The survey indicated a high proportion of narrow pavement and shoulders, and many lengths of substandard pavement, shoulders and pavement edges. Various other works, including the construction of additional overtaking lanes, and bridge and subway widenings, were also required. As with the previous 1977 survey, it was concluded that a large increase in available funds is required to upgrade this road to an adequate standard (a).

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

On 30 and 31 may, 1985 the traffic and safety department of the nrma conducted a survey of trunk road 55 from the great western highway north to gulgong. The survey indicated a high proportion of narrow pavement and shoulders, and many lengths of substandard pavement, shoulders and pavement edges. Various other works, including the construction of additional overtaking lanes, and bridge and subway widenings, were also required. As with the previous 1977 survey, it was concluded that a large increase in available funds is required to upgrade this road to an adequate standard (a).

Key concepts: Overtaking, Shoulders, Transport engineering, Bridge (graph theory), Upgrade, Road traffic, Engineering, Forensic engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Trunk road 55: lithgow to gulgong — Research Paper | ScholarLens