ROUNDABOUT CONTROL IS SIGNAL SUCCESS

M Belcher

Open publisher page 1 citations

Abstract

The first signal controlled roundabout in the West Midlands is now operational on a four-armed layout on the Wolverhampton ring road carrying between 4000 and 5000 vehicles per hour at peak periods. A computer simulation of the network, treating the roundabout as four t junctions linked together showed that a modified TRANSYT system could reduce delays at peak periods. Because delays could increase outside the peaks, the signals were operated on a part-time basis. An additional lane was provided on one of the approaches and the radii on the roundabout inside was increased slightly to provide greater width at the stop lines. A microprocessor controller uses parallel-stage streaming allowing the junction to operate as a four independent two-stage installation. Green times and offsets calculated using TRANSYT have proved very effective but improvements could be gained by having different control plans for different days of the week. Eventually the junction will be linked with others within the utc area as part of the country SCOOT system. (TRRL)

About this research paper

What this paper is about

The first signal controlled roundabout in the West Midlands is now operational on a four-armed layout on the Wolverhampton ring road carrying between 4000 and 5000 vehicles per hour at peak periods. A computer simulation of the network, treating the roundabout as four t junctions linked together showed that a modified TRANSYT system could reduce delays at peak periods. Because delays could increase outside the peaks, the signals were operated on a part-time basis. An additional lane was provided on one of the approaches and the radii on the roundabout inside was increased slightly to provide greater width at the stop lines. A microprocessor controller uses parallel-stage streaming allowing the junction to operate as a four independent two-stage installation. Green times and offsets calculated using TRANSYT have proved very effective but improvements could be gained by having different control plans for different days of the week. Eventually the junction will be linked with others within the utc area as part of the country SCOOT system. (TRRL)

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The first signal controlled roundabout in the West Midlands is now operational on a four-armed layout on the Wolverhampton ring road carrying between 4000 and 5000 vehicles per hour at peak periods. A computer simulation of the network, treating the roundabout as four t junctions linked together showed that a modified TRANSYT system could reduce delays at peak periods. Because delays could increase outside the peaks, the signals were operated on a part-time basis. An additional lane was provided on one of the approaches and the radii on the roundabout inside was increased slightly to provide greater width at the stop lines. A microprocessor controller uses parallel-stage streaming allowing the junction to operate as a four independent two-stage installation. Green times and offsets calculated using TRANSYT have proved very effective but improvements could be gained by having different control plans for different days of the week. Eventually the junction will be linked with others within the utc area as part of the country SCOOT system. (TRRL)

Key concepts: Roundabout, Ring road, SIGNAL (programming language), Transport engineering, Computer science, Controller (irrigation), Control (management), Simulation

Related papers

Back to paper searchBrowse research topicsOriginal source
ROUNDABOUT CONTROL IS SIGNAL SUCCESS — Research Paper | ScholarLens