2002Unpublished venueRequires access

SHARING TRACKS WITH DRIVERLESS TRAINS

Konrad Schmidt, H. Beismann

Open publisher page 1 citations

Abstract

The city of Nurnberg has developed plans to phase in the first fully- automatic metro line in Germany. In November 2001, the city's public transport operator, VAG, awarded a contract to Siemens Transportation Systems to supply 30 two-car driverless trains and to equip two metro lines for fully-automated operation. One existing line runs from Nurnberg airport in the north to Rothenbach in the southwest. When a second, fully-automatic line is constructed it will operate as branches off the first line, which will not be converted to a fully- automatic line until 2007. As a result, conventional trains and fully-automatic trains will share track across the city center for a time. Siemens designed a signaling package for these hybrid operations that is based on inductive loop transmission.

About this research paper

What this paper is about

The city of Nurnberg has developed plans to phase in the first fully- automatic metro line in Germany. In November 2001, the city's public transport operator, VAG, awarded a contract to Siemens Transportation Systems to supply 30 two-car driverless trains and to equip two metro lines for fully-automated operation. One existing line runs from Nurnberg airport in the north to Rothenbach in the southwest. When a second, fully-automatic line is constructed it will operate as branches off the first line, which will not be converted to a fully- automatic line until 2007. As a result, conventional trains and fully-automatic trains will share track across the city center for a time. Siemens designed a signaling package for these hybrid operations that is based on inductive loop transmission.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The city of Nurnberg has developed plans to phase in the first fully- automatic metro line in Germany. In November 2001, the city's public transport operator, VAG, awarded a contract to Siemens Transportation Systems to supply 30 two-car driverless trains and to equip two metro lines for fully-automated operation. One existing line runs from Nurnberg airport in the north to Rothenbach in the southwest. When a second, fully-automatic line is constructed it will operate as branches off the first line, which will not be converted to a fully- automatic line until 2007. As a result, conventional trains and fully-automatic trains will share track across the city center for a time. Siemens designed a signaling package for these hybrid operations that is based on inductive loop transmission.

Key concepts: Train, Siemens, Track (disk drive), Line (geometry), Public transport, Computer science, Telecommunications, Transport engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
SHARING TRACKS WITH DRIVERLESS TRAINS — Research Paper | ScholarLens