MATCHING M/W PRACTICE TO REQUIRED USE OF TRACK--PART II: TIES AND BALLAST
R E Ahlf
Abstract
R E Ahlf
Abstract
The track structure from subballast through ballast to the ties is discussed. Ballast materials, cleaning and detrimental effects of mud pumping are discussed. Track stiffness is affected by ballast depth and fouling, as well as by subgrade conditions. At the end is a handy table of recommendations for handling subgrade, ballast and ties.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The track structure from subballast through ballast to the ties is discussed. Ballast materials, cleaning and detrimental effects of mud pumping are discussed. Track stiffness is affected by ballast depth and fouling, as well as by subgrade conditions. At the end is a handy table of recommendations for handling subgrade, ballast and ties.
Key concepts: Ballast, Subgrade, Track (disk drive), Engineering, Matching (statistics), Stiffness, Geotechnical engineering, Structural engineering