The author discusses obstacles in the way of developing a high- speed railway in Portugal, in particular the topography and use of broad gauge track. Comprehensive infrastructure modernisation planned in 1988 to provide safer running conditions, higher speeds, higher axle loads and greater use of electric traction on the existing network is described. In view of this investment decisions were taken not to change the gauge and that any high speed rail link would have to be a separate system. The Portuguese are therefore looking to design a system which will allow the two networks to be coordinated. Current studies on possible high- speed lines are outlined, in particular links between Lisbon, Porto and Madrid. The financial implications and justification for such schemes are considered. This paper was presented at the EURAILSPEED 92 conference held in Brussels, April 27-29, 1992. For the covering abstract see IRRD 853180.

About this research paper

What this paper is about

The author discusses obstacles in the way of developing a high- speed railway in Portugal, in particular the topography and use of broad gauge track. Comprehensive infrastructure modernisation planned in 1988 to provide safer running conditions, higher speeds, higher axle loads and greater use of electric traction on the existing network is described. In view of this investment decisions were taken not to change the gauge and that any high speed rail link would have to be a separate system. The Portuguese are therefore looking to design a system which will allow the two networks to be coordinated. Current studies on possible high- speed lines are outlined, in particular links between Lisbon, Porto and Madrid. The financial implications and justification for such schemes are considered. This paper was presented at the EURAILSPEED 92 conference held in Brussels, April 27-29, 1992. For the covering abstract see IRRD 853180.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The author discusses obstacles in the way of developing a high- speed railway in Portugal, in particular the topography and use of broad gauge track. Comprehensive infrastructure modernisation planned in 1988 to provide safer running conditions, higher speeds, higher axle loads and greater use of electric traction on the existing network is described. In view of this investment decisions were taken not to change the gauge and that any high speed rail link would have to be a separate system. The Portuguese are therefore looking to design a system which will allow the two networks to be coordinated. Current studies on possible high- speed lines are outlined, in particular links between Lisbon, Porto and Madrid. The financial implications and justification for such schemes are considered. This paper was presented at the EURAILSPEED 92 conference held in Brussels, April 27-29, 1992. For the covering abstract see IRRD 853180.

Key concepts: Portuguese, Rail network, Modernization theory, Axle, Transport engineering, SAFER, Electric traction, Track (disk drive)