1993Unpublished venueRequires access

DESIGNATION OF A SYSTEM OF PRIORITY (RED) ROUTES AND CREATION OF THE TRAFFIC DIRECTOR FOR LONDON

Mark Allan

Open publisher page 0 citations

Abstract

This paper describes various aspects of London's new system of Priority Routes (Red Routes), and discusses the creation of the post of Traffic Director for London. Priority Routes aim to reduce the impact of congestion and improve the movement of existing traffic, by using London's existing road system more efficiently, so that people and goods can move around London more easily, reliably and safely. The key to this approach is to achieve the right balance between conflicting demands for road space, so that all these aims are fulfilled. There is no intention to achieve any of them at the expense of the environment. Along a Priority Route, traffic management is reviewed in detail, metre by metre, and appropriate traffic regulations are introduced. Between January and March 1992, the Department of Transport (DTp) consulted widely about which roads should be Priority Routes. The proposals were based on the Primary Route Network, which includes most major roads serving London. Additional bus priority routes are being planned. The DTp tested various measures, that are likely to be used, on a 12.5km Pilot Red Route Scheme in North and East London, whose results were dramatically successful at reducing road accident casualties and journey times of buses and other vehicles. The DTp aims for all Priority Routes in London to be operational by 1997. For the covering abstract see IRRD 866164.

About this research paper

What this paper is about

This paper describes various aspects of London's new system of Priority Routes (Red Routes), and discusses the creation of the post of Traffic Director for London. Priority Routes aim to reduce the impact of congestion and improve the movement of existing traffic, by using London's existing road system more efficiently, so that people and goods can move around London more easily, reliably and safely. The key to this approach is to achieve the right balance between conflicting demands for road space, so that all these aims are fulfilled. There is no intention to achieve any of them at the expense of the environment. Along a Priority Route, traffic management is reviewed in detail, metre by metre, and appropriate traffic regulations are introduced. Between January and March 1992, the Department of Transport (DTp) consulted widely about which roads should be Priority Routes. The proposals were based on the Primary Route Network, which includes most major roads serving London. Additional bus priority routes are being planned. The DTp tested various measures, that are likely to be used, on a 12.5km Pilot Red Route Scheme in North and East London, whose results were dramatically successful at reducing road accident casualties and journey times of buses and other vehicles. The DTp aims for all Priority Routes in London to be operational by 1997. For the covering abstract see IRRD 866164.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper describes various aspects of London's new system of Priority Routes (Red Routes), and discusses the creation of the post of Traffic Director for London. Priority Routes aim to reduce the impact of congestion and improve the movement of existing traffic, by using London's existing road system more efficiently, so that people and goods can move around London more easily, reliably and safely. The key to this approach is to achieve the right balance between conflicting demands for road space, so that all these aims are fulfilled. There is no intention to achieve any of them at the expense of the environment. Along a Priority Route, traffic management is reviewed in detail, metre by metre, and appropriate traffic regulations are introduced. Between January and March 1992, the Department of Transport (DTp) consulted widely about which roads should be Priority Routes. The proposals were based on the Primary Route Network, which includes most major roads serving London. Additional bus priority routes are being planned. The DTp tested various measures, that are likely to be used, on a 12.5km Pilot Red Route Scheme in North and East London, whose results were dramatically successful at reducing road accident casualties and journey times of buses and other vehicles. The DTp aims for all Priority Routes in London to be operational by 1997. For the covering abstract see IRRD 866164.

Key concepts: Transport engineering, Traffic congestion, Computer science, Operations research, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
DESIGNATION OF A SYSTEM OF PRIORITY (RED) ROUTES AND CREATION OF THE TRAFFIC DIRECTOR FOR LONDON — Research Paper | ScholarLens