NORTHEAST CORRIDOR HIGH SPEED RAIL PASSENGER SERVICE IMPROVEMENT STUDY. TASK 5. ELECTRIFICATION

H Sutcliffe, J S Williams, Michel A. Thomet, Darring White

Open publisher page 0 citations

Abstract

The report describes existing equipment and physical conditions within the Corridor. After establishing performance objectives and design standards for the upgrading of existing systems and the construction of new electrification facilities, it examines the voltage and frequency alternatives available and identifies the most cost-effective solution. Estimated costs, for each alternative are presented. Environmental aspects are referenced, alternative traction power supply and distribution systems are reviewed, and the status and dynamics of catenary systems are analyzed from first principles. The report closes with an economic analysis of the electrification alternatives.

About this research paper

What this paper is about

The report describes existing equipment and physical conditions within the Corridor. After establishing performance objectives and design standards for the upgrading of existing systems and the construction of new electrification facilities, it examines the voltage and frequency alternatives available and identifies the most cost-effective solution. Estimated costs, for each alternative are presented. Environmental aspects are referenced, alternative traction power supply and distribution systems are reviewed, and the status and dynamics of catenary systems are analyzed from first principles. The report closes with an economic analysis of the electrification alternatives.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The report describes existing equipment and physical conditions within the Corridor. After establishing performance objectives and design standards for the upgrading of existing systems and the construction of new electrification facilities, it examines the voltage and frequency alternatives available and identifies the most cost-effective solution. Estimated costs, for each alternative are presented. Environmental aspects are referenced, alternative traction power supply and distribution systems are reviewed, and the status and dynamics of catenary systems are analyzed from first principles. The report closes with an economic analysis of the electrification alternatives.

Key concepts: Electrification, Catenary, Transport engineering, Rural electrification, Task (project management), Service (business), Engineering, Electricity

Related papers

Back to paper searchBrowse research topicsOriginal source
NORTHEAST CORRIDOR HIGH SPEED RAIL PASSENGER SERVICE IMPROVEMENT STUDY. TASK 5. ELECTRIFICATION — Research Paper | ScholarLens