1985Mass transitRequires access

BOSTON: MAKING A GOOD SYSTEM BETTER

B Carrington

Open publisher page 0 citations

Abstract

Opening in late 1986 will be the 4.7-mile relocation of the southern end of the Orange Line of Massachusetts Bay Transportation Authority and its adjacent Amtrak route used by MBTA commuter trains as well as by Northeast Corridor intercity service. Already open is the 3.2-mile extension of the Red Line from Harvard Square to Alewife. MBTA has regularly used former railroad commuter routes for extensions of its rapid transit system. After a ban on highway construction inside Boston's Route 128 beltway, rights of way designated and often cleared for highways, have been utilized for rapid transit and urban renewal; some of the funding also comes from the Interstate Transfer legislation. Details of the two rapid transit line extensions are given.

About this research paper

What this paper is about

Opening in late 1986 will be the 4.7-mile relocation of the southern end of the Orange Line of Massachusetts Bay Transportation Authority and its adjacent Amtrak route used by MBTA commuter trains as well as by Northeast Corridor intercity service. Already open is the 3.2-mile extension of the Red Line from Harvard Square to Alewife. MBTA has regularly used former railroad commuter routes for extensions of its rapid transit system. After a ban on highway construction inside Boston's Route 128 beltway, rights of way designated and often cleared for highways, have been utilized for rapid transit and urban renewal; some of the funding also comes from the Interstate Transfer legislation. Details of the two rapid transit line extensions are given.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Opening in late 1986 will be the 4.7-mile relocation of the southern end of the Orange Line of Massachusetts Bay Transportation Authority and its adjacent Amtrak route used by MBTA commuter trains as well as by Northeast Corridor intercity service. Already open is the 3.2-mile extension of the Red Line from Harvard Square to Alewife. MBTA has regularly used former railroad commuter routes for extensions of its rapid transit system. After a ban on highway construction inside Boston's Route 128 beltway, rights of way designated and often cleared for highways, have been utilized for rapid transit and urban renewal; some of the funding also comes from the Interstate Transfer legislation. Details of the two rapid transit line extensions are given.

Key concepts: Relocation, Transport engineering, Train, Clearance, Mile, Rapid transit, Transit (satellite), Legislation

Related papers

Back to paper searchBrowse research topicsOriginal source
BOSTON: MAKING A GOOD SYSTEM BETTER — Research Paper | ScholarLens