2004Unpublished venueRequires access

A Case Study: I-295/I-95/SR 9A Interchange Project, Jacksonville, Florida

Roger DiGiulio, Brett Pielstick

Open publisher page 0 citations

Abstract

This case study will address the design and construction of a segmental box girder bridge utilizing the balanced cantilever method of erection for the SR9A Interchange in Jacksonville, Florida. Parsons was the engineer of record and construction engineering and inspection for this conventional design-bid project. This case study will address why a segmental box girder was the best structure type for economic, maintenance cost and aesthetic reasons and will also address current construction practices.

About this research paper

What this paper is about

This case study will address the design and construction of a segmental box girder bridge utilizing the balanced cantilever method of erection for the SR9A Interchange in Jacksonville, Florida. Parsons was the engineer of record and construction engineering and inspection for this conventional design-bid project. This case study will address why a segmental box girder was the best structure type for economic, maintenance cost and aesthetic reasons and will also address current construction practices.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This case study will address the design and construction of a segmental box girder bridge utilizing the balanced cantilever method of erection for the SR9A Interchange in Jacksonville, Florida. Parsons was the engineer of record and construction engineering and inspection for this conventional design-bid project. This case study will address why a segmental box girder was the best structure type for economic, maintenance cost and aesthetic reasons and will also address current construction practices.

Key concepts: Bridge (graph theory), Engineering, Box girder, Cantilever, Design–build, Civil engineering, Construction management, Construction engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
A Case Study: I-295/I-95/SR 9A Interchange Project, Jacksonville, Florida — Research Paper | ScholarLens