1973TravauxRequires access

SPECIAL FOUNDATIONS. THEIR APPLICATION AND EVOLUTION IN THE MOTORWAY CONSTRUCTION AT THE BOIS DE BOULOGNE

Jean‐Philippe Molinié

Open publisher page 0 citations

Abstract

THIS ARTICLE DESCRIBES THE SPECIAL ROAD WORKS IN PROGRESS FROM JANUARY 1969 TO MAY 1973, DURING THE CONSTRUCTION OF THE WESTERN RING ROAD IN PARIS AND ITS LINKING WITH THE A13 MOTORWAY, IN THE AUTEUIL-BOULOGNE REGION. THEY WERE REQUIRED BECAUSE OF THE GEOLOGY OF THE AREA WHICH NECESSITATED DEEP FOUNDATIONS AND BECAUSE OF THE EXISTENCE OF A SHALLOW ALLUVIAL-WATER TABLE. DETAILS ARE GIVEN OF THE SLURRY TRENCH WALLS BUILT IN THE AUTEUIL-PASSY COVERED TRENCH (FOUNDATION), IN THE PRINCES CAR PARK (RETAINING WALL, AND SUPPORT OF ONE OF THE UNDERGROUND RAILWAY ARCHES), AT THE AUTEUIL INTERCHANGE (PROTECTION AGAINST THE WATER TABLE), AT THE SEINE BRIDGE (BRIDGE ABUTMENTS AND SUPPORTS OF THE VIADUCT ON THE BANK), AND IN THE COVERED TRENCH OF THE A13 MOTORWAY (FOUNDATIONS BY MEANS OF PREFABRICATED WALLS).

About this research paper

What this paper is about

THIS ARTICLE DESCRIBES THE SPECIAL ROAD WORKS IN PROGRESS FROM JANUARY 1969 TO MAY 1973, DURING THE CONSTRUCTION OF THE WESTERN RING ROAD IN PARIS AND ITS LINKING WITH THE A13 MOTORWAY, IN THE AUTEUIL-BOULOGNE REGION. THEY WERE REQUIRED BECAUSE OF THE GEOLOGY OF THE AREA WHICH NECESSITATED DEEP FOUNDATIONS AND BECAUSE OF THE EXISTENCE OF A SHALLOW ALLUVIAL-WATER TABLE. DETAILS ARE GIVEN OF THE SLURRY TRENCH WALLS BUILT IN THE AUTEUIL-PASSY COVERED TRENCH (FOUNDATION), IN THE PRINCES CAR PARK (RETAINING WALL, AND SUPPORT OF ONE OF THE UNDERGROUND RAILWAY ARCHES), AT THE AUTEUIL INTERCHANGE (PROTECTION AGAINST THE WATER TABLE), AT THE SEINE BRIDGE (BRIDGE ABUTMENTS AND SUPPORTS OF THE VIADUCT ON THE BANK), AND IN THE COVERED TRENCH OF THE A13 MOTORWAY (FOUNDATIONS BY MEANS OF PREFABRICATED WALLS).

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THIS ARTICLE DESCRIBES THE SPECIAL ROAD WORKS IN PROGRESS FROM JANUARY 1969 TO MAY 1973, DURING THE CONSTRUCTION OF THE WESTERN RING ROAD IN PARIS AND ITS LINKING WITH THE A13 MOTORWAY, IN THE AUTEUIL-BOULOGNE REGION. THEY WERE REQUIRED BECAUSE OF THE GEOLOGY OF THE AREA WHICH NECESSITATED DEEP FOUNDATIONS AND BECAUSE OF THE EXISTENCE OF A SHALLOW ALLUVIAL-WATER TABLE. DETAILS ARE GIVEN OF THE SLURRY TRENCH WALLS BUILT IN THE AUTEUIL-PASSY COVERED TRENCH (FOUNDATION), IN THE PRINCES CAR PARK (RETAINING WALL, AND SUPPORT OF ONE OF THE UNDERGROUND RAILWAY ARCHES), AT THE AUTEUIL INTERCHANGE (PROTECTION AGAINST THE WATER TABLE), AT THE SEINE BRIDGE (BRIDGE ABUTMENTS AND SUPPORTS OF THE VIADUCT ON THE BANK), AND IN THE COVERED TRENCH OF THE A13 MOTORWAY (FOUNDATIONS BY MEANS OF PREFABRICATED WALLS).

Key concepts: Trench, Bridge (graph theory), Foundation (evidence), Alluvium, Geology, Water table, Table (database), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
SPECIAL FOUNDATIONS. THEIR APPLICATION AND EVOLUTION IN THE MOTORWAY CONSTRUCTION AT THE BOIS DE BOULOGNE — Research Paper | ScholarLens