TUNNELING THROUGH THE MARSH

J Krukowski

Open publisher page 0 citations

Abstract

This article describes the excavation of an 834-ft-long segment of a 1200-ft tunnel that will run beneath a yet-to-be-completed runway extension at New Orleans International Airport. Future road-building contracts will link the tunnel with U.S. 61 and I-10, providing a vital north-south route for the New Orleans metro area. The contractor, Boh Brothers, is using two 3-in. Honda water pumps rated at 8 hp, and one 6-in. Gorman-Rupp pump to remove water from the cut and cover work. As there is concern about the tunnel rising up because of groundwater pressure, many of the 1,927 wooden piles Boh is driving into the ground are tie-down piles which feature steel anchors. Further details of the construction are given in this article.

About this research paper

What this paper is about

This article describes the excavation of an 834-ft-long segment of a 1200-ft tunnel that will run beneath a yet-to-be-completed runway extension at New Orleans International Airport. Future road-building contracts will link the tunnel with U.S. 61 and I-10, providing a vital north-south route for the New Orleans metro area. The contractor, Boh Brothers, is using two 3-in. Honda water pumps rated at 8 hp, and one 6-in. Gorman-Rupp pump to remove water from the cut and cover work. As there is concern about the tunnel rising up because of groundwater pressure, many of the 1,927 wooden piles Boh is driving into the ground are tie-down piles which feature steel anchors. Further details of the construction are given in this article.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article describes the excavation of an 834-ft-long segment of a 1200-ft tunnel that will run beneath a yet-to-be-completed runway extension at New Orleans International Airport. Future road-building contracts will link the tunnel with U.S. 61 and I-10, providing a vital north-south route for the New Orleans metro area. The contractor, Boh Brothers, is using two 3-in. Honda water pumps rated at 8 hp, and one 6-in. Gorman-Rupp pump to remove water from the cut and cover work. As there is concern about the tunnel rising up because of groundwater pressure, many of the 1,927 wooden piles Boh is driving into the ground are tie-down piles which feature steel anchors. Further details of the construction are given in this article.

Key concepts: Runway, Excavation, Engineering, Groundwater, Civil engineering, Work (physics), Marsh, Forensic engineering