1977Unpublished venueRequires access

THE REPAIR OF THE AUTOROUTE DU NORD MOTORWAY BETWEEN LE BOURGET AND ROISSY-EN-FRANCE, THE PROVINCE - PARIS CARRIAGEWAY

Jan Tavernier, R Riou, M Ray, P Merien, F Gailledrat, J Chauchot

Open publisher page 0 citations

Abstract

ON THE EXIT FROM PARIS, THE AUTOROUTE DU NORD MOTORWAY COMPRISES A CONCRETE PAVEMENT CONSTRUCTED IN 1964. BECAUSE OF STRUCTURAL FAULTS AND THE EFFECT OF TRAFFIC AND WATER INFILTRATION, SERIOUS DAMAGE HAD OCCURRED TO THE PAVEMENT, AND THIS NECESSITATED THE DEMOLITION AND THEN THE RECONSTRUCTION IN CONCRETE OF TWO OF THE THREE LANES IN THE PROVINCE - PARIS DIRECTION DURING THE SUMMER OF 1976. THIS WORK, WHICH WAS CARRIED OUT IN A VERY SHORT PERIOD, THANKS TO CAREFUL ORGANISATION, STRICT SURVEILLANCE AND A GOOD WORKING TEAM, MADE IT POSSIBLE TO TEST SUCCESSFULLY INNOVATIVE TECHNIQUES SUCH AS DRAINAGE TRENCH AND LEAN CONCRETE FOUNDATIONS, WHICH OPENED NEW POSSIBILITIES IN THE FIELD OF CONCRETE PAVEMENTS.

About this research paper

What this paper is about

ON THE EXIT FROM PARIS, THE AUTOROUTE DU NORD MOTORWAY COMPRISES A CONCRETE PAVEMENT CONSTRUCTED IN 1964. BECAUSE OF STRUCTURAL FAULTS AND THE EFFECT OF TRAFFIC AND WATER INFILTRATION, SERIOUS DAMAGE HAD OCCURRED TO THE PAVEMENT, AND THIS NECESSITATED THE DEMOLITION AND THEN THE RECONSTRUCTION IN CONCRETE OF TWO OF THE THREE LANES IN THE PROVINCE - PARIS DIRECTION DURING THE SUMMER OF 1976. THIS WORK, WHICH WAS CARRIED OUT IN A VERY SHORT PERIOD, THANKS TO CAREFUL ORGANISATION, STRICT SURVEILLANCE AND A GOOD WORKING TEAM, MADE IT POSSIBLE TO TEST SUCCESSFULLY INNOVATIVE TECHNIQUES SUCH AS DRAINAGE TRENCH AND LEAN CONCRETE FOUNDATIONS, WHICH OPENED NEW POSSIBILITIES IN THE FIELD OF CONCRETE PAVEMENTS.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

ON THE EXIT FROM PARIS, THE AUTOROUTE DU NORD MOTORWAY COMPRISES A CONCRETE PAVEMENT CONSTRUCTED IN 1964. BECAUSE OF STRUCTURAL FAULTS AND THE EFFECT OF TRAFFIC AND WATER INFILTRATION, SERIOUS DAMAGE HAD OCCURRED TO THE PAVEMENT, AND THIS NECESSITATED THE DEMOLITION AND THEN THE RECONSTRUCTION IN CONCRETE OF TWO OF THE THREE LANES IN THE PROVINCE - PARIS DIRECTION DURING THE SUMMER OF 1976. THIS WORK, WHICH WAS CARRIED OUT IN A VERY SHORT PERIOD, THANKS TO CAREFUL ORGANISATION, STRICT SURVEILLANCE AND A GOOD WORKING TEAM, MADE IT POSSIBLE TO TEST SUCCESSFULLY INNOVATIVE TECHNIQUES SUCH AS DRAINAGE TRENCH AND LEAN CONCRETE FOUNDATIONS, WHICH OPENED NEW POSSIBILITIES IN THE FIELD OF CONCRETE PAVEMENTS.

Key concepts: Carriageway, Demolition, Trench, Forensic engineering, Engineering, Civil engineering, Geology, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
THE REPAIR OF THE AUTOROUTE DU NORD MOTORWAY BETWEEN LE BOURGET AND ROISSY-EN-FRANCE, THE PROVINCE - PARIS CARRIAGEWAY — Research Paper | ScholarLens