Botniabanan - a Swedish pioneer project

L Westberg

Open publisher page 0 citations

Abstract

Progress with the Bothnia railway line in northern Sweden is outlined. The new line replaces an existing trunk line located 40km off the coast. The construction of the Bothnia line will cost 13 billion SEK (1.4 billion Euros). The Swedish state owns 91% of the company Botniabanan AB, which will finance and construct the railway, with the remaining 9% owned by the municipalities Kramfors, Oernskoeldsvik, Nordmaling and Umeae. The project is characterised by measures taken to protect the environment, a design enabling passenger trains to run at a maximum speed of 250km/h and freight traffic to run at 120 km/h, and the installation of the European radio-based traffic management system, RETMS, without optical signalling. Details are given of the financing of the Bothnia Line railway.

About this research paper

What this paper is about

Progress with the Bothnia railway line in northern Sweden is outlined. The new line replaces an existing trunk line located 40km off the coast. The construction of the Bothnia line will cost 13 billion SEK (1.4 billion Euros). The Swedish state owns 91% of the company Botniabanan AB, which will finance and construct the railway, with the remaining 9% owned by the municipalities Kramfors, Oernskoeldsvik, Nordmaling and Umeae. The project is characterised by measures taken to protect the environment, a design enabling passenger trains to run at a maximum speed of 250km/h and freight traffic to run at 120 km/h, and the installation of the European radio-based traffic management system, RETMS, without optical signalling. Details are given of the financing of the Bothnia Line railway.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Progress with the Bothnia railway line in northern Sweden is outlined. The new line replaces an existing trunk line located 40km off the coast. The construction of the Bothnia line will cost 13 billion SEK (1.4 billion Euros). The Swedish state owns 91% of the company Botniabanan AB, which will finance and construct the railway, with the remaining 9% owned by the municipalities Kramfors, Oernskoeldsvik, Nordmaling and Umeae. The project is characterised by measures taken to protect the environment, a design enabling passenger trains to run at a maximum speed of 250km/h and freight traffic to run at 120 km/h, and the installation of the European radio-based traffic management system, RETMS, without optical signalling. Details are given of the financing of the Bothnia Line railway.

Key concepts: Train, Euros, Transport engineering, Engineering, Line (geometry), Freight trains, Railway line, Geography

Related papers

Back to paper searchBrowse research topicsOriginal source
Botniabanan - a Swedish pioneer project — Research Paper | ScholarLens