Abstract

This article relates the history of tram and light rail services in Genova, Italy, from the 1960s on, especially the development of a new light metro line. Plans for this line were first formulated in the early 1970s. It would re-use old rail tunnels and other abandoned old railway infrastructure, and also use the Certosa Tunnel, which was then being used by buses. The tunnel was closed to buses early in 1982, but progress on the project was very slow, while the planned route was being drastically changed. Due to the line's strict specifications, the metro had to become heavier than originally planned, and thus more expensive and slower to implement. The 2.6km section of line between Brin and Dinegro was opened on 13 June 1990, and its extension to Principe was opened on 27 July 1992. Tunnelling is in progress beyond Principe, and the eventual line is still planned to have 11 stations. The present basic three-station weekday service has 10-minute headways.

About this research paper

What this paper is about

This article relates the history of tram and light rail services in Genova, Italy, from the 1960s on, especially the development of a new light metro line. Plans for this line were first formulated in the early 1970s. It would re-use old rail tunnels and other abandoned old railway infrastructure, and also use the Certosa Tunnel, which was then being used by buses. The tunnel was closed to buses early in 1982, but progress on the project was very slow, while the planned route was being drastically changed. Due to the line's strict specifications, the metro had to become heavier than originally planned, and thus more expensive and slower to implement. The 2.6km section of line between Brin and Dinegro was opened on 13 June 1990, and its extension to Principe was opened on 27 July 1992. Tunnelling is in progress beyond Principe, and the eventual line is still planned to have 11 stations. The present basic three-station weekday service has 10-minute headways.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article relates the history of tram and light rail services in Genova, Italy, from the 1960s on, especially the development of a new light metro line. Plans for this line were first formulated in the early 1970s. It would re-use old rail tunnels and other abandoned old railway infrastructure, and also use the Certosa Tunnel, which was then being used by buses. The tunnel was closed to buses early in 1982, but progress on the project was very slow, while the planned route was being drastically changed. Due to the line's strict specifications, the metro had to become heavier than originally planned, and thus more expensive and slower to implement. The 2.6km section of line between Brin and Dinegro was opened on 13 June 1990, and its extension to Principe was opened on 27 July 1992. Tunnelling is in progress beyond Principe, and the eventual line is still planned to have 11 stations. The present basic three-station weekday service has 10-minute headways.

Key concepts: Light rail, Line (geometry), Transport engineering, Telecommunications, Service (business), Section (typography), Engineering, Public transport

Related papers

Back to paper searchBrowse research topicsOriginal source
GENOVA: BACK IN THE TRAMWAY BUSINESS: PART 1: THE INTERURBANS AND THE 'LIGHT METRO' — Research Paper | ScholarLens