An account is given of the construction of the St. Gotthard road tunnel, comparisons being with the similarly routed rail tunnel. The author describes the work involved which includes the provision of a parallel safety tunnel, connections between the two tunnels, air ducts and four ventilation shafts. A geological survey carried out during the building of the rail tunnel has been useful in predicting rock conditions. The use of the first sliding floor in Europe is described and brief details given of construction methods and equipment. /TRRL/

About this research paper

What this paper is about

An account is given of the construction of the St. Gotthard road tunnel, comparisons being with the similarly routed rail tunnel. The author describes the work involved which includes the provision of a parallel safety tunnel, connections between the two tunnels, air ducts and four ventilation shafts. A geological survey carried out during the building of the rail tunnel has been useful in predicting rock conditions. The use of the first sliding floor in Europe is described and brief details given of construction methods and equipment. /TRRL/

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

An account is given of the construction of the St. Gotthard road tunnel, comparisons being with the similarly routed rail tunnel. The author describes the work involved which includes the provision of a parallel safety tunnel, connections between the two tunnels, air ducts and four ventilation shafts. A geological survey carried out during the building of the rail tunnel has been useful in predicting rock conditions. The use of the first sliding floor in Europe is described and brief details given of construction methods and equipment. /TRRL/

Key concepts: Railway tunnel, Engineering, Work (physics), Civil engineering, Tunnel construction, Channel tunnel, Geotechnical engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
ROCKY ROAD FOR ST GOTTHARD TUNNEL — Research Paper | ScholarLens