The author considers a number of problems connected with the creation of major European surface transport networks which have been illustrated by the Channel Tunnel. Discussed first is the importance of missing links and the need for uniform development of infrastructure particularly in terms of capacity. It is anticipated that the link between the Channel Tunnel and London will be a bottleneck. Secondly, decisions being taken concerning safety and security in the Channel Tunnel may be seen as a precedent for excessively severe regulations on all European railways. Lastly, railway technical harmonisation is seen as a particularly important challenge.Reconciliation of the technical and operational requirements of British Rail, SNCF and SNCB in constructing the Channel Tunnel served to highlight the considerable problems and costs involved. This paper was presented at the EURAILSPEED 92 conference held in Brussels, April 27-29, 1992. For the covering abstract see IRRD 853180.

About this research paper

What this paper is about

The author considers a number of problems connected with the creation of major European surface transport networks which have been illustrated by the Channel Tunnel. Discussed first is the importance of missing links and the need for uniform development of infrastructure particularly in terms of capacity. It is anticipated that the link between the Channel Tunnel and London will be a bottleneck. Secondly, decisions being taken concerning safety and security in the Channel Tunnel may be seen as a precedent for excessively severe regulations on all European railways. Lastly, railway technical harmonisation is seen as a particularly important challenge.Reconciliation of the technical and operational requirements of British Rail, SNCF and SNCB in constructing the Channel Tunnel served to highlight the considerable problems and costs involved. This paper was presented at the EURAILSPEED 92 conference held in Brussels, April 27-29, 1992. For the covering abstract see IRRD 853180.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The author considers a number of problems connected with the creation of major European surface transport networks which have been illustrated by the Channel Tunnel. Discussed first is the importance of missing links and the need for uniform development of infrastructure particularly in terms of capacity. It is anticipated that the link between the Channel Tunnel and London will be a bottleneck. Secondly, decisions being taken concerning safety and security in the Channel Tunnel may be seen as a precedent for excessively severe regulations on all European railways. Lastly, railway technical harmonisation is seen as a particularly important challenge.Reconciliation of the technical and operational requirements of British Rail, SNCF and SNCB in constructing the Channel Tunnel served to highlight the considerable problems and costs involved. This paper was presented at the EURAILSPEED 92 conference held in Brussels, April 27-29, 1992. For the covering abstract see IRRD 853180.

Key concepts: Channel tunnel, Bottleneck, Channel (broadcasting), Transport engineering, Engineering, Telecommunications, Operations research, Operations management