1978Japanese railway engineeringRequires access

DEVELOPMENT OF THE SHINKANSEN TRAIN TRAFFIC SIMULATOR

A Ohtsu

Open publisher page 0 citations

Abstract

To study traffic stability problems on the Shinkansen, the JNR Railway Technical Research Institute developed the Shinkansen Train Traffic Simulator (STRATS). The STRATS has been designed as a general-purpose system which will permit the simulation of train traffic on all the Shinkansen lines inclusive of those now planned for construction. In this system the train movements are governed by train arrival and departure times, track numbers at stations etc., as prescribed in the predetermined train schedule.

About this research paper

What this paper is about

To study traffic stability problems on the Shinkansen, the JNR Railway Technical Research Institute developed the Shinkansen Train Traffic Simulator (STRATS). The STRATS has been designed as a general-purpose system which will permit the simulation of train traffic on all the Shinkansen lines inclusive of those now planned for construction. In this system the train movements are governed by train arrival and departure times, track numbers at stations etc., as prescribed in the predetermined train schedule.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To study traffic stability problems on the Shinkansen, the JNR Railway Technical Research Institute developed the Shinkansen Train Traffic Simulator (STRATS). The STRATS has been designed as a general-purpose system which will permit the simulation of train traffic on all the Shinkansen lines inclusive of those now planned for construction. In this system the train movements are governed by train arrival and departure times, track numbers at stations etc., as prescribed in the predetermined train schedule.

Key concepts: Engineering, Train, Schedule, Track (disk drive), Transport engineering, Simulation, Automotive engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
DEVELOPMENT OF THE SHINKANSEN TRAIN TRAFFIC SIMULATOR — Research Paper | ScholarLens