2023•Unpublished venueOpen access

Accelerated Bridge Construction on Maui’s Hana Highway

Sean Oroho, Tom Kubicz

Open full text 0 citations

Abstract

Through the partnership between the Hawaii Department of Transportation (HDOT) and the Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration, six of the bridge structures along the State-owned portion of the Hana Highway will be replaced. Due to the nature of this road, and the limited opportunities for detours and road closures, along with context-sensitive solution design and right-of-way considerations, these structures will be replaced utilizing an accelerated bridge construction (ABC) technique known as a lateral bridge slide. To our knowledge, this project will be the first implementation of this ABC technique.

Open-access reader

About this research paper

What this paper is about

Through the partnership between the Hawaii Department of Transportation (HDOT) and the Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration, six of the bridge structures along the State-owned portion of the Hana Highway will be replaced. Due to the nature of this road, and the limited opportunities for detours and road closures, along with context-sensitive solution design and right-of-way considerations, these structures will be replaced utilizing an accelerated bridge construction (ABC) technique known as a lateral bridge slide. To our knowledge, this project will be the first implementation of this ABC technique.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Through the partnership between the Hawaii Department of Transportation (HDOT) and the Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration, six of the bridge structures along the State-owned portion of the Hana Highway will be replaced. Due to the nature of this road, and the limited opportunities for detours and road closures, along with context-sensitive solution design and right-of-way considerations, these structures will be replaced utilizing an accelerated bridge construction (ABC) technique known as a lateral bridge slide. To our knowledge, this project will be the first implementation of this ABC technique.

Key concepts: Bridge (graph theory), Context (archaeology), Highway system, State highway, Transport engineering, General partnership, Highway engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Accelerated Bridge Construction on Maui’s Hana Highway — Research Paper | ScholarLens