1978Electr. World; (United States)Requires access

DOE: T-O-D rates shift kWh and kW

Chad Johnson, S. Mintz

Open publisher page 0 citations

Abstract

Technical report:In 1975, FEA, in cooperation with state and local utility authorities, initiated a series of field projects that collected electricity usage data under new electric utility rate designs and load management techniques. Individual projects included a wide range of load-management and electricity rate design alternatives, with emphasis on several forms of time-of-day rates. The program is now funded by the U.S. Dept. of Energy. Objectives of the program, kWh usage effects, kw demand effects, and sources of the load changes are discussed. Initial results indicate actual or effective shifts in electricity consumption from peak to off-peak periods, and reductions in diversified demand coincident with system peaks. (10 graphs)

About this research paper

What this paper is about

Technical report:In 1975, FEA, in cooperation with state and local utility authorities, initiated a series of field projects that collected electricity usage data under new electric utility rate designs and load management techniques. Individual projects included a wide range of load-management and electricity rate design alternatives, with emphasis on several forms of time-of-day rates. The program is now funded by the U.S. Dept. of Energy. Objectives of the program, kWh usage effects, kw demand effects, and sources of the load changes are discussed. Initial results indicate actual or effective shifts in electricity consumption from peak to off-peak periods, and reductions in diversified demand coincident with system peaks. (10 graphs)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Technical report:In 1975, FEA, in cooperation with state and local utility authorities, initiated a series of field projects that collected electricity usage data under new electric utility rate designs and load management techniques. Individual projects included a wide range of load-management and electricity rate design alternatives, with emphasis on several forms of time-of-day rates. The program is now funded by the U.S. Dept. of Energy. Objectives of the program, kWh usage effects, kw demand effects, and sources of the load changes are discussed. Initial results indicate actual or effective shifts in electricity consumption from peak to off-peak periods, and reductions in diversified demand coincident with system peaks. (10 graphs)

Key concepts: Electricity, Load management, Demand response, Electricity demand, Range (aeronautics), Peak demand, Environmental economics, Electric utility

Related papers

Back to paper searchBrowse research topicsOriginal source
DOE: T-O-D rates shift kWh and kW — Research Paper | ScholarLens