Assessing Project Contingency Reserves with the Expected Cost Overrun Risk Measure

Jean-Paul Paquin, Pierre‐Paul Morin, Annick Lambert, Tamás Koplyay

Open publisher page 6 citations

Abstract

This paper proposes a coherent risk measure to assess project cost overrun contingency reserves: the project expected cost overrun (ECO). It is shown that the traditional project cost-percentile metric does not qualify as a coherent risk measure and, therefore, that the ECO metric should be adopted. Obtained from the tail expectation of the project cost probability distribution, it measures the average value of project costs exceeding, at any significance level, the project cost baseline. A positive, unique, and exact closed-form solution to the ECO risk measure is devised under, among others, the normal probability distribution. The resulting project cost overrun contingency reserve may be interpreted as an insurance contract covering contingent risk factors and claimable by project managers from their project director once preidentified and agreed-upon contingent high-risk cost impacts are taken into account. The project ECO risk measure is extended to assess the project expected time overrun (ETO) and the project expected time overrun penalty (ETOP) risk measures, quantities that will prove indispensable for successfully tendering under any contractual form the minimum value of project time and project cost bids. They will be covering, at the very least, all relevant potential low-probability high-risk contingent risk factor impacts.

About this research paper

What this paper is about

This paper proposes a coherent risk measure to assess project cost overrun contingency reserves: the project expected cost overrun (ECO). It is shown that the traditional project cost-percentile metric does not qualify as a coherent risk measure and, therefore, that the ECO metric should be adopted. Obtained from the tail expectation of the project cost probability distribution, it measures the average value of project costs exceeding, at any significance level, the project cost baseline. A positive, unique, and exact closed-form solution to the ECO risk measure is devised under, among others, the normal probability distribution. The resulting project cost overrun contingency reserve may be interpreted as an insurance contract covering contingent risk factors and claimable by project managers from their project director once preidentified and agreed-upon contingent high-risk cost impacts are taken into account. The project ECO risk measure is extended to assess the project expected time overrun (ETO) and the project expected time overrun penalty (ETOP) risk measures, quantities that will prove indispensable for successfully tendering under any contractual form the minimum value of project time and project cost bids. They will be covering, at the very least, all relevant potential low-probability high-risk contingent risk factor impacts.

Why it matters

OpenAlex reports 6 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper proposes a coherent risk measure to assess project cost overrun contingency reserves: the project expected cost overrun (ECO). It is shown that the traditional project cost-percentile metric does not qualify as a coherent risk measure and, therefore, that the ECO metric should be adopted. Obtained from the tail expectation of the project cost probability distribution, it measures the average value of project costs exceeding, at any significance level, the project cost baseline. A positive, unique, and exact closed-form solution to the ECO risk measure is devised under, among others, the normal probability distribution. The resulting project cost overrun contingency reserve may be interpreted as an insurance contract covering contingent risk factors and claimable by project managers from their project director once preidentified and agreed-upon contingent high-risk cost impacts are taken into account. The project ECO risk measure is extended to assess the project expected time overrun (ETO) and the project expected time overrun penalty (ETOP) risk measures, quantities that will prove indispensable for successfully tendering under any contractual form the minimum value of project time and project cost bids. They will be covering, at the very least, all relevant potential low-probability high-risk contingent risk factor impacts.

Key concepts: Cost contingency, Cost overrun, Procurement, Project risk management, Measure (data warehouse), Risk analysis (engineering), Risk management, Risk measure