1982Pipeline Gas J.; (United States)Requires access

North Slope pipeline work strong; gas pipeline project deferred

D. Hale

Open publisher page 0 citations

Abstract

Over 225 miles of insulated pipelines will be installed on the North Slope as part of a 5-year, $10.5 billion program by Sohio and Arco to maintain output from the field to feed the trans-Alaska oil pipeline. New lines are for waterflood supply systems, low pressure production systems, produced water handling, and gas handling. Pipeline construction is quite active at both Prudhoe Bay and at Kuparuk Field. Future projects include an oil line to the Beaufort Sea, the Polar Gas Project, the Arctic Pilot project, and the Northern Tier Pipeline.

About this research paper

What this paper is about

Over 225 miles of insulated pipelines will be installed on the North Slope as part of a 5-year, $10.5 billion program by Sohio and Arco to maintain output from the field to feed the trans-Alaska oil pipeline. New lines are for waterflood supply systems, low pressure production systems, produced water handling, and gas handling. Pipeline construction is quite active at both Prudhoe Bay and at Kuparuk Field. Future projects include an oil line to the Beaufort Sea, the Polar Gas Project, the Arctic Pilot project, and the Northern Tier Pipeline.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Over 225 miles of insulated pipelines will be installed on the North Slope as part of a 5-year, $10.5 billion program by Sohio and Arco to maintain output from the field to feed the trans-Alaska oil pipeline. New lines are for waterflood supply systems, low pressure production systems, produced water handling, and gas handling. Pipeline construction is quite active at both Prudhoe Bay and at Kuparuk Field. Future projects include an oil line to the Beaufort Sea, the Polar Gas Project, the Arctic Pilot project, and the Northern Tier Pipeline.

Key concepts: Pipeline transport, Beaufort sea, Pipeline (software), Arctic, Petroleum engineering, Work (physics), Natural gas, Petroleum

Related papers

Back to paper searchBrowse research topicsOriginal source
North Slope pipeline work strong; gas pipeline project deferred — Research Paper | ScholarLens