TAKING THE LEAD

H Russell

Open publisher page 0 citations

Abstract

This article reports rapid progress on the construction of the 16km-long Oresund fixed link, which will carry a four-lane motorway and a two-track electrified railway. From Denmark to Sweden, the successive stages of the link will be: (1) a 430m-long artificial peninsula; (2) a 3510m-long immersed tube tunnel; (3) a 4055m-long artificial island to bring the road and railway above sea level, then separate them before they enter the double deck of the bridges; (4) a 3014m-long western approach bridge; (5) a 1092m-long bridge with a 490m main span; and (6) a 3739m-long eastern approach bridge. The tunnel has precast fabricated units for its four main tubes, one for road and one for rail in each direction. It is well over half finished; each of its 20 176m-long units weighs about 57,000t and is cast in eight sections, which are towed into position by tugs. The construction of the artificial island began with the formation of coarse pebble bunds with an interior geotextile lining and clay seal, used material from other parts of the project as fill, and has now been completed. The high bridge has two 240m-high reinforced concrete pylons, each with two legs and one crossbeam, and eight bridge girders; its pylons are growing and its first deck elements have been erected. The eastern approach bridge is steadily growing longer.

About this research paper

What this paper is about

This article reports rapid progress on the construction of the 16km-long Oresund fixed link, which will carry a four-lane motorway and a two-track electrified railway. From Denmark to Sweden, the successive stages of the link will be: (1) a 430m-long artificial peninsula; (2) a 3510m-long immersed tube tunnel; (3) a 4055m-long artificial island to bring the road and railway above sea level, then separate them before they enter the double deck of the bridges; (4) a 3014m-long western approach bridge; (5) a 1092m-long bridge with a 490m main span; and (6) a 3739m-long eastern approach bridge. The tunnel has precast fabricated units for its four main tubes, one for road and one for rail in each direction. It is well over half finished; each of its 20 176m-long units weighs about 57,000t and is cast in eight sections, which are towed into position by tugs. The construction of the artificial island began with the formation of coarse pebble bunds with an interior geotextile lining and clay seal, used material from other parts of the project as fill, and has now been completed. The high bridge has two 240m-high reinforced concrete pylons, each with two legs and one crossbeam, and eight bridge girders; its pylons are growing and its first deck elements have been erected. The eastern approach bridge is steadily growing longer.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article reports rapid progress on the construction of the 16km-long Oresund fixed link, which will carry a four-lane motorway and a two-track electrified railway. From Denmark to Sweden, the successive stages of the link will be: (1) a 430m-long artificial peninsula; (2) a 3510m-long immersed tube tunnel; (3) a 4055m-long artificial island to bring the road and railway above sea level, then separate them before they enter the double deck of the bridges; (4) a 3014m-long western approach bridge; (5) a 1092m-long bridge with a 490m main span; and (6) a 3739m-long eastern approach bridge. The tunnel has precast fabricated units for its four main tubes, one for road and one for rail in each direction. It is well over half finished; each of its 20 176m-long units weighs about 57,000t and is cast in eight sections, which are towed into position by tugs. The construction of the artificial island began with the formation of coarse pebble bunds with an interior geotextile lining and clay seal, used material from other parts of the project as fill, and has now been completed. The high bridge has two 240m-high reinforced concrete pylons, each with two legs and one crossbeam, and eight bridge girders; its pylons are growing and its first deck elements have been erected. The eastern approach bridge is steadily growing longer.

Key concepts: Precast concrete, Deck, Bridge (graph theory), Engineering, Girder, Span (engineering), Peninsula, Track (disk drive)

Related papers

Back to paper searchBrowse research topicsOriginal source
TAKING THE LEAD — Research Paper | ScholarLens