2021•IOP Conference Series Earth and Environmental ScienceOpen access

Research on the Design of Crescent Ribbed Steel Bifurcation Pipe of High Head Hydropower Station- Take Jinzhan River -I Hydropower Station as an Example

Shaohong Pan, Yunen Wu, Jiajia Ding

Open full text 1 citations

Abstract

Abstract The design of the steel bifurcation pipe of hydropower station should be based on the actual situation of the project, and the reasonable arrangement, structure form and structure calculation method should be selected to meet the requirements of bearing capacity, stability and stiffness of the steel bifurcation pipe. In this paper, the selection, arrangement and design of the crescent- ribbed steel bifurcation pipe of Jinzhan River -I hydropower station are analyzed and calculated, so that its structure is reasonable, economical and meets the requirements of safe and stable operation. The steel bifurcation pipe has been built and put into operation, which proves that the design is safe, feasible and reasonable.

Open-access reader

About this research paper

What this paper is about

Abstract The design of the steel bifurcation pipe of hydropower station should be based on the actual situation of the project, and the reasonable arrangement, structure form and structure calculation method should be selected to meet the requirements of bearing capacity, stability and stiffness of the steel bifurcation pipe. In this paper, the selection, arrangement and design of the crescent- ribbed steel bifurcation pipe of Jinzhan River -I hydropower station are analyzed and calculated, so that its structure is reasonable, economical and meets the requirements of safe and stable operation. The steel bifurcation pipe has been built and put into operation, which proves that the design is safe, feasible and reasonable.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract The design of the steel bifurcation pipe of hydropower station should be based on the actual situation of the project, and the reasonable arrangement, structure form and structure calculation method should be selected to meet the requirements of bearing capacity, stability and stiffness of the steel bifurcation pipe. In this paper, the selection, arrangement and design of the crescent- ribbed steel bifurcation pipe of Jinzhan River -I hydropower station are analyzed and calculated, so that its structure is reasonable, economical and meets the requirements of safe and stable operation. The steel bifurcation pipe has been built and put into operation, which proves that the design is safe, feasible and reasonable.

Key concepts: Hydropower, Bifurcation, Stiffness, Engineering, Head (geology), Structural engineering, Stability (learning theory), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on the Design of Crescent Ribbed Steel Bifurcation Pipe of High Head Hydropower Station- Take Jinzhan River -I Hydropower Station as an Example — Research Paper | ScholarLens