2021Journal of Physics Conference SeriesOpen access

Improvement of the drawing process on the shopfloor taking into account simulation in industry 4.0

И. Н. Хаймович, S U Chaeva

Open full text 0 citations

Abstract

Abstract The article analyzes the production process and equipment for producing FLRY-25-C wire; simulation experiments were carried out in AnyLogic, which allow assessing the effect of changing various system parameters on the output of the final product. The author identified a number of problems in the production cycle of manufacturing wire FLRY-25-C and proposed measures to improve the efficiency of this process. As a result, it was found that the implementation of the proposed measures helps to reduce the duration of the production cycle for the wire manufacture by 68 hours, respectively and to increase the productivity of the process by 40%.

Open-access reader

About this research paper

What this paper is about

Abstract The article analyzes the production process and equipment for producing FLRY-25-C wire; simulation experiments were carried out in AnyLogic, which allow assessing the effect of changing various system parameters on the output of the final product. The author identified a number of problems in the production cycle of manufacturing wire FLRY-25-C and proposed measures to improve the efficiency of this process. As a result, it was found that the implementation of the proposed measures helps to reduce the duration of the production cycle for the wire manufacture by 68 hours, respectively and to increase the productivity of the process by 40%.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract The article analyzes the production process and equipment for producing FLRY-25-C wire; simulation experiments were carried out in AnyLogic, which allow assessing the effect of changing various system parameters on the output of the final product. The author identified a number of problems in the production cycle of manufacturing wire FLRY-25-C and proposed measures to improve the efficiency of this process. As a result, it was found that the implementation of the proposed measures helps to reduce the duration of the production cycle for the wire manufacture by 68 hours, respectively and to increase the productivity of the process by 40%.

Key concepts: Production cycle, Manufacturing engineering, Productivity, Process (computing), Production (economics), Product (mathematics), Industrial engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Improvement of the drawing process on the shopfloor taking into account simulation in industry 4.0 — Research Paper | ScholarLens